Data center siteSite record

DCI Indonesia H2 Karawang Campus

Pertiwi Lestari Industrial Estate, Karawang, JB, IndonesiaPartially operational
Capacity
30 MW
Operating critical IT
Lead participant
PT DCI Indonesia Tbk
Operator
Last updated
Aug 26, 2026
Most recent public record update

About DCI Indonesia H2 Karawang Campus

DCI Indonesia's H2 campus has two live facilities. H2-01 has operated since November 2021; H2-02 was inaugurated in June 2023; DCI's current page reports 30 MW total IT load and at least 600 MW of long-term scalability.

Capacity

Operating critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load30 MWActual · DCI Indonesia H2 Karawang Campus
It Load27 MWActual · DCI Indonesia H2 Karawang Campus
It Load15 MWActual · DCI Indonesia H2 Karawang Campus
Future Potential600 MWForecast · DCI Indonesia H2 Karawang Campus
Onsite Generation30 MWForecast · DCI Indonesia H2 Karawang Campus

Development

3 phases · 2 milestones
H2-01Operational

Facility-specific capacity is directly stated.

1 building

H2-02Operational

Standalone H2-02 IT capacity has not been publicly disclosed; the campus-level 12 MW figure is not assigned to H2-02.

1 building

H2 full campus potentialOperational

86-hectare long-term envelope; not delivered capacity.

Nov 1, 2021
H2-01 operations begin
Completed
Jun 22, 2023
DCI and Salim Group inaugurate H2-02
Completed

Infrastructure

Electric GridOperational

30 MW

Current combined H2-01 and H2-02 total.

Electric GridReported Context

27 MW

Combined campus state at the June 2023 H2-02 inauguration.

Electric GridPartially Operational

600 MW IT

At least 600 MW scalable potential; not delivered capacity.

SolarPlanned Or Represented

30 MW generation

Solar-generation potential across roughly 30 hectares; not IT load.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
4

No map point available

Power & interconnection: 4

Facts & sources

Published claims and their source links.

11 facts
Live Facility Count
2 facilities
Actual
Current Total It Load
30 MW
Actual
Historical Total It Load
27 MW
Actual
H2 01 It Capacity
15 MW
Actual
H2 01 Opening
2021-11
Actual
H2 02 Opening
2023-06-22
Actual
Site Area
86 hectares
Actual
Future It Capacity Potential
600 MW IT
Forecast
Solar Pv Potential
30 MW generation
Forecast
Location
Pertiwi Lestari Industrial Estate, Karawang
Actual
Asset Partner
DISM, part of Salim Group
Actual