DCI Indonesia H2 Karawang Campus
About DCI Indonesia H2 Karawang Campus
DCI Indonesia's H2 campus has two live facilities. H2-01 has operated since November 2021; H2-02 was inaugurated in June 2023; DCI's current page reports 30 MW total IT load and at least 600 MW of long-term scalability.
Capacity
Operating critical ITDevelopment
3 phases · 2 milestonesFacility-specific capacity is directly stated.
1 building
Standalone H2-02 IT capacity has not been publicly disclosed; the campus-level 12 MW figure is not assigned to H2-02.
1 building
86-hectare long-term envelope; not delivered capacity.
Infrastructure
30 MW
Current combined H2-01 and H2-02 total.
27 MW
Combined campus state at the June 2023 H2-02 inauguration.
600 MW IT
At least 600 MW scalable potential; not delivered capacity.
30 MW generation
Solar-generation potential across roughly 30 hectares; not IT load.