Edged Project Atlas (Allentown)

South Whitehall Township, Pennsylvania, United StatesProposed
Evidence
Planned / design
725 MW
Updated
Oct 28, 2026

Edged US proposes Project Atlas on roughly 410 acres in South Whitehall Township, Pennsylvania. The current plan is three data center buildings totaling about 1.5 million square feet and a reported 725 MW, with zero-water cooling, customer-funded power infrastructure, no local incentives requested and preliminary review still underway.

Capacity

Reported capacity

Planned / design or future potential

725 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Preliminary land-development reviewAnnounced or preconstruction

3 buildings

Edged US proposes Project Atlas on roughly 410 acres in South Whitehall Township, Pennsylvania. The current plan is three data center buildings totaling about 1.5 million square feet and a reported 725 MW, with zero-water cooling, customer-funded power infrastructure, no local incentives requested and preliminary review still underway.

Milestones (1)
Planning Commission reviewed Project Atlas materials

Jul 9, 2026 · Recorded actual event

Completed · Permit filed

Source not linked

Participants

Edged Energy

Developer

Sources by role

Site & development

Location context

Actual

Edged Project Atlas (Allentown) | South Whitehall Township | Pennsylvania | US

Source

Site area

Reported rounded

410 acres

Source

Building count

Reported rounded

3 buildings

Source

Gross floor area

Reported rounded

1,480,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

725 MW future full build site capacity; not measured operating IT load.

Source

Local incentives

Actual

None requested

Source

Infrastructure & permits

Technical details (2)
Cooling system

Planned or represented

Closed-loop design with zero daily cooling-water use.

Electric grid

Planned or represented

725 MW

Project says it will fund required power infrastructure.

Other · Under review

Project Atlas

South Whitehall Township

Jul 9, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.