EdgeCore Ashburn Data Center Campus
Under construction · Sterling, Virginia, United States
EdgeCore Culpeper Campus is a physical data center campus. EdgeCore Culpeper Campus is located in Nalles Mill Road / Culpeper Technology Zone, VA, US and is a data center campus in preconstruction status. Participants include EdgeCore Digital Infrastructure as developer, Cielo Digital Infrastructure as developer, Rappahannock Electric Cooperative as utility. Development comprises Current two-building first build (planned), Superseded 2024 three-building plan (superseded). Key milestones include EdgeCore announced acquisition and original 216 MW plan (2024-07-18) and Current operator target for capacity availability (2029-01-01). electric utility service — 196 MW critical IT: Current campus design; utility-service agreement and ramp not publicly disclosed. cooling — 0.01 liters per kWh maximum: Closed-loop chilled-water design target. Permitting includes rezoning and data center campus approval for Cielo/EdgeCore Nalles Mill site (approved). Incentives include technology zone rebate eligibility (general program; project award not publicly disclosed) for Up to 40% of taxes paid over five years if investment/job/wage conditions are met.
Projects sharing a market, utility, or organization.
Under construction · Sterling, Virginia, United States
Preconstruction · Louisa County, Virginia, United States
196 MW critical IT design across 920,000 square feet.
2 buildings
216 MW initial / 432 MW potential / 1.4m sf / early-2028 power plan retained as history.
3 buildings
196 MW critical IT
0.01 liters per kWh maximum
Closed-loop chilled-water design target.