Data center siteSite record

Digital Carver Brickyard Campus

Manassas, Virginia, United StatesUnder construction
Capacity
192 MW
Planned / design
Lead participant
Digital Realty Trust
Developer · Operator · Owner
Last updated
Aug 25, 2026
Most recent public record update

About Digital Carver Brickyard Campus

Northern Virginia campus with two disclosed 96 MW facilities; wholly owned by Digital Realty after June 30, 2026. Digital Carver Brickyard Campus is located in Manassas, VA, US and is a data center campus in construction status. Participants include Digital Realty as developer, Digital Realty as operator, Digital Realty as owner. Published specifications include 192 MW of planned capacity. Development comprises Manassas Facility 1 (under construction), Manassas Facility 2 (under construction). Key milestones include Brickyard joint ventures become wholly owned by Digital Realty (2026-06-30). data center it load — 192 MW: Two 96 MW facilities; power is planned IT load, not operating load. Permitting includes Air permit for emergency-generation equipment for Digital Carver Brickyard / DigitalThird Second Manassas (issued).

Program relationships

1 linked

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential192 MWActual · Digital Carver Brickyard Campus

Development

2 phases · 1 milestones
Manassas Facility 1Under Construction

One 96 MW facility; identity-to-stabilization ordering within Brickyard is not publicly resolved.

1 building

Manassas Facility 2Under Construction

One 96 MW facility; source says two facilities stabilize in H1 2027 and the third in H1 2028 without a public facility mapping.

1 building

Jun 30, 2026
Brickyard joint ventures become wholly owned by Digital Realty
Completed

Infrastructure

Electric GridUnder Construction

192 MW

Two 96 MW facilities; power is planned IT load, not operating load.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

6 facts
Facility Count
2 facilities
Actual
Planned It Capacity
192 MW
Actual
Fully Leased
True
Actual
Digital Realty Wholly Owned From
True
Actual
Lease Term
15 years
Actual
Annual Lease Escalator
3.6 percent
Actual