EdgeCore Mesa Data Center Campus
- Planned critical IT
- 496 MW
- Updated
- Oct 28, 2026
EdgeCore is developing a five-building hyperscale campus in Mesa, Arizona. The 84-acre campus is designed for 496 MW of critical IT load across more than 2.7 million square feet, with closed-loop air-cooled systems intended to minimize water use. Closed-loop air-cooled cooling; high-density AI and cloud design.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
EdgeCore Mesa Data Center Campus: Under construction.
Milestones (2)
Date not disclosed · Event timing type not established
In progress · Construction started
Source not linkedDate not disclosed · Event timing type not established
In progress · Status changed
Source not linkedParticipants
Site & development
Additional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
496 MW
496 MW planned or design IT capacity
Planned or represented
Closed-loop air-cooled cooling; high-density AI and cloud design.
Project map
Other · Under review
EdgeCore Mesa Data Center Campus
City of Mesa
Aug 1, 2026
Sources (2)
- EdgeCore Mesa North Campus planning record · Aug 1, 2026 · Corroborating
- Phoenix Data Centers · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Partially operational · Mesa, Arizona, United States
Same locality: Mesa