EdgeCore is developing a five-building hyperscale campus in Mesa, Arizona. The 84-acre campus is designed for 496 MW of critical IT load across more than 2.7 million square feet, with closed-loop air-cooled systems intended to minimize water use. Closed-loop air-cooled cooling; high-density AI and cloud design.

Capacity

Reported capacity

Design

496 MW

Source

Capacity

Design

496 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Construction programUnder construction

EdgeCore Mesa Data Center Campus: Under construction.

Milestones (2)
EdgeCore Mesa Data Center Campus: Campus under development with buildings delivered in phases.

Date not disclosed · Event timing type not established

In progress · Construction started

Source not linked
EdgeCore Mesa Data Center Campus — Under construction

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

EdgeCore Digital Infrastructure

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

EdgeCore Mesa campus | Mesa | Arizona | United States

Source

Location

Actual

Mesa, AZ, US

Source

Development scale

Actual

84 Acres; five data centers

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

Source stated full campus critical IT load

Source

Project identity

Actual

EdgeCore Mesa Data Center Campus

Source

Lifecycle status

Actual

Under construction

Source

Participant roles

Actual

EdgeCore Digital Infrastructure

Source

Capacity basis

Actual

496 MW planned or design IT capacity

Source

Infrastructure

Actual

Closed loop air cooled cooling; high density AI and cloud design.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

496 MW

496 MW planned or design IT capacity

Site facility

Planned or represented

Closed-loop air-cooled cooling; high-density AI and cloud design.

Other · Under review

EdgeCore Mesa Data Center Campus

City of Mesa

Aug 1, 2026

Sources (2)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
NTT Phoenix Elliot Road Campus

Partially operational · Mesa, Arizona, United States

Same locality: Mesa

Compare in a collection