Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 10 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Equinix IL3 IstanbulSite · Connected record
Istanbul, Türkiye
Equinix, Inc.
Operating
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix King Air Industria Cape Town ProgramProgram · Connected record
Cape Town, WC, South Africa
Cape Town Municipal Planning TribunalEquinix, Inc.
Status under review
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix King Air Industria Phase 2 Data CenterSite · Connected record
Cape Town, WC, South Africa
Equinix, Inc.
Permitted
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix King Air Industria Phase 4 Data CenterSite · Connected record
Cape Town, WC, South Africa
Equinix, Inc.
Permitted
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix KL2 CyberjayaSite · Connected record
Cyberjaya, Selangor, Malaysia
Equinix, Inc.
Preconstruction
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix LG3 LagosSite · Connected record
43 Saka Tinubu Street, Lagos, LA, Nigeria
Equinix, Inc.
Construction
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix MD5 AlcobendasSite · Connected record
Alcobendas, Community of Madrid, Spain
Equinix, Inc.
Operating
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix OS5x OsakaSite · Connected record
Osaka, Japan
Equinix, Inc.GIC
Preconstruction
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix PA12x Paris xScaleSite · Connected record
1-3 Rue Charles Michels, Argenteuil, Île-de-France, France
City of ArgenteuilEquinix, Inc.
Construction
10 MW
Basis: Basis not specifiedPlanned / design
Equinix, Inc.
Oct 28, 2026
Equinix RJ3 Rio de JaneiroSite · Connected record
Rua Maria Soares Sendas, Area 6 B2, Parque Barreto, São João de Meriti, Rio de Janeiro, Brazil
Equinix, Inc.Municipality of São João de Meriti
Partially operational
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix SG6Site · Connected record
Singapore
Equinix, Inc.Infocomm Media Development Authority
Construction
20 MW
Basis: Basis not specifiedPlanned / design
Equinix, Inc.
Oct 28, 2026
Equinix SP7 São PauloSite · Connected record
Santana de Parnaíba, São Paulo metro, São Paulo, Brazil
Equinix, Inc.
Construction
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
Equinix SV18 Silicon Valley Data CenterSite · Connected record
San Jose area, California, United States
Equinix, Inc.
Partially operational
Not establishedIn published records
Equinix, Inc.
Oct 28, 2026
eStruxture CAL-3 Rocky ViewSite · Connected record
Calgary metropolitan area, Alberta, Canada
Calgary Economic DevelopmenteStruxture Data Centers
Construction
Not establishedIn published records
eStruxture Data Centers
Oct 28, 2026
Ethiopia National AI FactoryProgram · Connected record
Addis Ababa, Ethiopia
Ethiopian Artificial Intelligence Institute
Status under review
Not establishedIn published records
Ethiopian Artificial Intelligence Institute
Oct 28, 2026
Evolution TH01 Bang NaSite · Connected record
Bang Na, Bangkok, Thailand
Central Pattana Public Company LimitedEvolution Data Centres
Construction
Not establishedIn published records
Evolution Data Centres
Oct 28, 2026
Famous-Barr Warehouse Data CenterSite · Connected record
Midtown St. Louis, Missouri, United States
TeraWatt Infrastructure
Preconstruction
Not establishedIn published records
TeraWatt Infrastructure
Oct 28, 2026
Farmington Technology Park / TractProgram · Connected record
Farmington, Minnesota, United States
City of FarmingtonDakota County District Court
Status under review
Not establishedIn published records
MNLCO Farmington Two, LLC
Oct 28, 2026
Fibernet MercuryDelta CampusSite · Connected record
Delta, Utah, United States
Fibernet
Proposed
Not establishedIn published records
Fibernet
Oct 28, 2026
Firebird Armenia AI FactorySite · Connected record
Hrazdan, Kotayk Province, Armenia
Firebird AIGovernment of Armenia
Partially operational
15 MW
Basis: Critical ITPlanned critical IT
Firebird AI
Oct 28, 2026
Firmus Batam NVIDIA DSX Compute DeploymentSite · Connected record
Batam, KR, Indonesia
Firmus TechnologiesNVIDIA
Preconstruction
Not establishedIn published records
Firmus Technologies
Oct 28, 2026
Firmus Wesley Vale AI FactorySite · Connected record
Wesley Vale, Tasmania, Australia
Firmus TechnologiesTasNetworks
Proposed
46 MW
Basis: Critical ITPlanned critical IT
Firmus Technologies
Oct 28, 2026
Flexential Atlanta-Norcross 2Site · Connected record
Norcross / Peachtree Corners, Georgia, United States
Flexential
Preconstruction
4.5 MW
Basis: Basis not specifiedPlanned / design
Flexential
Oct 28, 2026
Flexential Douglasville 1 Data CenterSite · Connected record
Douglasville, Georgia, United States
Flexential
Operating
22.5 MW
Basis: Critical ITPlanned critical IT
Flexential
Oct 28, 2026
Flexential Talty Data Center CampusSite · Connected record
Talty, Texas, United States
Flexential
Preconstruction
108 MW
Basis: Basis not specifiedPlanned / design
Flexential
Oct 28, 2026
Foxconn Kaohsiung Advanced Computing CenterSite · Connected record
Kaohsiung, Taiwan
FoxconnNVIDIA
Construction
Not establishedIn published records
Foxconn
Oct 28, 2026
G42 UAE–US AI CampusSite · Connected record
Abu Dhabi, United Arab Emirates

Overlapping scope — see profile before aggregating

G42Khazna Data Centers
Preconstruction
5,000 MW
Basis: Basis not specifiedPlanned / design
G42
Oct 28, 2026
G42-Microsoft Kenya Digital Ecosystem InitiativeProgram · Connected record
Kenya / Olkaria context, National / Nakuru context, Kenya
G42Kenya Ministry of Information, Communications and the Digital Economy
Status under review
Not establishedIn published records
G42
Oct 28, 2026
G42-Microsoft Olkaria Geothermal Data CenterSite · Connected record
Olkaria / Naivasha context, Nakuru, Kenya
EcoCloud LimitedG42
Delayed
1,000 MW
Basis: Basis not specifiedPlanned / design
EcoCloud Limited
Oct 28, 2026
Galaxy Caspian AI Data Center CampusSite · Connected record
Texas, United States
Galaxy Digital
Preconstruction
700 MW
Basis: Basis not specifiedPlanned / design
Galaxy Digital
Oct 28, 2026
Galaxy Data Center Banchang Rayong CampusSite · Connected record
Ban Chang, Rayong, Thailand
Galaxy Data Center
Preconstruction
404 MW
Basis: Critical ITPlanned critical IT
Galaxy Data Center
Oct 28, 2026
Galaxy Helios Data Center CampusSite · Connected record
Dickens County, Texas, United States
AEP TexasArgo Blockchain
Partially operational
526 MW
Basis: Critical ITContracted critical IT
Galaxy Digital
Oct 28, 2026
Galaxy Merlin AI Data Center CampusSite · Connected record
McGregor, Texas, United States
City of McGregorGalaxy Digital
Preconstruction
74 MW
Basis: Basis not specifiedContracted
Galaxy Digital
Oct 28, 2026
Galaxy Selene AI Data Center CampusSite · Connected record
Texas, United States
Galaxy Digital
Preconstruction
900 MW
Basis: Basis not specifiedPlanned / design
Galaxy Digital
Oct 28, 2026
Global Switch Amsterdam EastSite · Connected record
Amsterdam, North Holland, Netherlands
Global Switch
Operating
32 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Amsterdam WestSite · Connected record
Amsterdam, North Holland, Netherlands
Global Switch
Operating
42 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Frankfurt NorthSite · Connected record
Frankfurt, Hesse, Germany
Global Switch
Operating
12 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Frankfurt SouthSite · Connected record
Frankfurt, Hesse, Germany
Global Switch
Operating
10 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Hong KongSite · Connected record
Tseung Kwan O, New Territories, Hong Kong SAR China
Global Switch
Operating
71 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch London EastSite · Connected record
London, England, United Kingdom
Global Switch
Operating
87 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch London NorthSite · Connected record
London, England, United Kingdom
Global Switch
Operating
18 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch London SouthSite · Connected record
London, England, United Kingdom
Global Switch
Preconstruction
Not establishedIn published records
Global Switch
Oct 28, 2026
Global Switch Madrid 1Site · Connected record
Madrid, Community of Madrid, Spain
Global Switch
Operating
14 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Madrid 2Site · Connected record
Madrid, Community of Madrid, Spain
Global Switch
Construction
56 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Paris EastSite · Connected record
Clichy, Île-de-France, France
Global Switch
Operating
22 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Paris NorthSite · Connected record
Clichy, Île-de-France, France
Global Switch
Operating
24 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Paris SouthSite · Connected record
Clichy, Île-de-France, France
Global Switch
Operating
18 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Paris WestSite · Connected record
Clichy, Île-de-France, France
Global Switch
Operating
17 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Singapore Tai SengSite · Connected record
Singapore
Global Switch
Operating
17 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026
Global Switch Singapore WoodlandsSite · Connected record
Singapore
Global Switch
Operating
22 MW
Basis: Critical ITPlanned critical IT
Global Switch
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.