Global Switch Madrid 1
Operating / Stabilized · Madrid, Community of Madrid, Spain
Global Switch Madrid 2 is now under construction beside Madrid 1. Its 56 MW figure is a future full-build boundary, with first service targeted for 2029 and full completion targeted for 2032. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Projects sharing a market, utility, or organization.
Operating / Stabilized · Madrid, Community of Madrid, Spain
Global Switch Madrid 2 is now under construction beside Madrid 1. Its 56 MW figure is a future full-build boundary, with first service targeted for 2029 and full completion targeted for 2032. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
56 MW
56 MW is the published future facility or full-build IT boundary; it is not operating load.
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
No map point available
Published claims and their source links.