Global Switch Singapore Woodlands
- Planned critical IT
- 22 MW
- Updated
- Oct 28, 2026
Global Switch Woodlands is the separate northern Singapore facility, physically distinct from Tai Seng. The 22 MW current operator boundary is used instead of the older 30 MW launch-era description, with 25,157 square metres and a 1.34 design PUE retained as facility attributes. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Global Switch Woodlands is the separate northern Singapore facility, physically distinct from Tai Seng. The 22 MW current operator boundary is used instead of the older 30 MW launch-era description, with 25,157 square metres and a 1.34 design PUE retained as facility attributes. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
Sep 10, 2019 · Recorded actual event
Completed · Commercial operation
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Global Switch Singapore Woodlands official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
Actual22 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceCapacity basis
Actual22 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
22 MW
22 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.