Global Switch Hong Kong

Tseung Kwan O, New Territories, Hong Kong SAR ChinaOperating / Stabilized
Capacity
71 MW
Planned critical IT
Lead participant
Global Switch
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Global Switch Hong Kong

Global Switch Hong Kong is a five-building operating campus in Tseung Kwan O. The 71 MW figure is the current operator facility boundary, supported by an independent green-building record but not presented as live utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load71 MWDesign · Global Switch Hong Kong
It Load71 MWDesign · Global Switch Hong Kong

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Global Switch Hong Kong is a five-building operating campus in Tseung Kwan O. The 71 MW figure is the current operator facility boundary, supported by an independent green-building record but not presented as live utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

71 MW

71 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

18 facts
Location Context
Global Switch Hong Kong | Tseung Kwan O | New Territories | HK
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
71 MW
Design
Capacity Basis
Global Switch publishes 71 MW for this project boundary.
Actual
Location Context
Global Switch Hong Kong | Tseung Kwan O | New Territories | HK
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
71 MW
Design
Capacity Basis
71 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
Global Switch
Actual
Project Location
Tseung Kwan O, New Territories, HK
Actual
Current Lifecycle
Operating
Actual
Capacity Classification
It load
Actual
Capacity Basis
71 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Building Count
5
Actual
Green Building Record
HK-BEAM / HKGBC project record
Actual