Global Switch Hong Kong
- Planned critical IT
- 71 MW
- Updated
- Oct 28, 2026
Global Switch Hong Kong is a five-building operating campus in Tseung Kwan O. The 71 MW figure is the current operator facility boundary, supported by an independent green-building record but not presented as live utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Global Switch Hong Kong is a five-building operating campus in Tseung Kwan O. The 71 MW figure is the current operator facility boundary, supported by an independent green-building record but not presented as live utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Participants
Developer
Sources by role
Developer (1)
- Global Switch Hong Kong official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
Actual71 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceCapacity basis
Actual71 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
71 MW
71 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.