Global Switch Amsterdam West

Amsterdam, North Holland, NetherlandsOperating / Stabilized
Capacity
42 MW
Planned critical IT
Lead participant
Global Switch
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Global Switch Amsterdam West

Global Switch Amsterdam West is a separately identified operating building in Global Switch’s Amsterdam campus. Its 42 MW boundary is not combined with the other building and does not represent instantaneous demand. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load42 MWDesign · Global Switch Amsterdam West
It Load42 MWDesign · Global Switch Amsterdam West

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Global Switch Amsterdam West is a separately identified operating building in Global Switch’s Amsterdam campus. Its 42 MW boundary is not combined with the other building and does not represent instantaneous demand. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

42 MW

42 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

18 facts
Location Context
Global Switch Amsterdam West | Amsterdam | North Holland | NL
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
42 MW
Design
Capacity Basis
Global Switch publishes 42 MW for this project boundary.
Actual
Location Context
Global Switch Amsterdam West | Amsterdam | North Holland | NL
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
42 MW
Design
Capacity Basis
42 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
Global Switch
Actual
Project Location
Amsterdam, North Holland, NL
Actual
Current Lifecycle
Operating
Actual
Capacity Classification
It load
Actual
Capacity Basis
42 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Amsterdam Building
West
Actual
Campus Role
Separate operating building within the Amsterdam campus
Actual