Global Switch Amsterdam West

Amsterdam, North Holland, NetherlandsOperating
Evidence
Planned critical IT
42 MW
Updated
Oct 28, 2026

Global Switch Amsterdam West is a separately identified operating building in Global Switch’s Amsterdam campus. Its 42 MW boundary is not combined with the other building and does not represent instantaneous demand. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Capacity

Reported capacity

Design

42 MW

Source

Reported capacity

Design

42 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

Global Switch Amsterdam West is a separately identified operating building in Global Switch’s Amsterdam campus. Its 42 MW boundary is not combined with the other building and does not represent instantaneous demand. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Participants

Global Switch

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Global Switch Amsterdam West | Amsterdam | North Holland | NL

Source

Location context

Actual

Global Switch Amsterdam West | Amsterdam | North Holland | NL

Source

Project location

Actual

Amsterdam, North Holland, NL

Source

Amsterdam building

Actual

West

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

Global Switch publishes 42 MW for this project boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

42 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

Global Switch

Source

Current lifecycle

Actual

Operating

Source

Capacity classification

Actual

It load

Source

Capacity basis

Actual

42 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Identity boundary

Actual

This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Source

Source refresh date

Actual

2026-08-29

Source

Campus role

Actual

Separate operating building within the Amsterdam campus

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

42 MW

42 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling system

Operational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Global Switch Amsterdam East

Operating · Amsterdam, North Holland, Netherlands

Same locality: Amsterdam · Shared participant: Global Switch

Compare in a collection
Equinix AM11 Data Center

Operating · Amsterdam, North Holland, Netherlands

Same locality: Amsterdam

Compare in a collection