G42 UAE–US AI Campus

Abu Dhabi, United Arab EmiratesPreconstruction
Capacity
5,000 MW
Planned / design
Lead participant
G42
Developer
Last updated
Aug 27, 2026
Most recent public record update

About G42 UAE–US AI Campus

G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.S. technology companies expected to operate facilities and nuclear, solar and gas resources proposed for supply. The campus remains a development program rather than an operating 5 GW facility.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design5,000 MWProposal · G42 UAE–US AI Campus
Future Potential5,000 MWProposal · G42 UAE–US AI Campus
Future Potential5,000 MW planned full development campus envelopeActual · G42 UAE–US AI Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

G42 UAE–US AI Campus: Development program.

G42 UAE–US AI Campus — Development program
In Progress
G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles.
In Progress

Infrastructure

Electric GridPlanned Or Represented

5,000 MW

5,000 MW planned full-development campus envelope

Site FacilityPlanned Or Represented

The campus remains a development program rather than an operating 5 GW facility.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Abu Dhabi, United Arab Emirates
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
5,000 MW
Proposal
Capacity Basis
Planned full build campus envelope
Actual
Project Identity
G42 UAE–US AI Campus
Actual
Lifecycle Status
Development program
Actual
Location
Abu Dhabi, AE
Actual
Participant Roles
G42, Khazna Data Centers
Actual
Capacity
5,000 MW
Proposal
Capacity Basis
5,000 MW planned full development campus envelope
Actual
Development Scale
G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.S
Actual
Infrastructure
The campus remains a development program rather than an operating 5 GW facility.
Actual