G42 UAE–US AI Campus
Abu Dhabi, United Arab EmiratesPreconstruction
Capacity
5,000 MW
Planned / design
Lead participant
G42
Developer
Last updated
Aug 27, 2026
Most recent public record update
About G42 UAE–US AI Campus
G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.S. technology companies expected to operate facilities and nuclear, solar and gas resources proposed for supply. The campus remains a development program rather than an operating 5 GW facility.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Design5,000 MWProposal · G42 UAE–US AI Campus
Future Potential5,000 MWProposal · G42 UAE–US AI Campus
Future Potential5,000 MW planned full development campus envelopeActual · G42 UAE–US AI Campus
Development
1 phases · 2 milestonesDevelopment programAnnounced Or Preconstruction
G42 UAE–US AI Campus: Development program.
—
G42 UAE–US AI Campus — Development program
In Progress—
G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles.
In ProgressInfrastructure
Electric GridPlanned Or Represented
5,000 MW
5,000 MW planned full-development campus envelope
Site FacilityPlanned Or Represented
The campus remains a development program rather than an operating 5 GW facility.
Project map
0 of 1 project point mappedInfrastructure facts
2
Mapped records
1
Capacity figures
1
No map point available
Power & interconnection: 1Site systems: 1
Facts & sources
Published claims and their source links.
Location ContextAbu Dhabi, United Arab EmiratesActual
Abu Dhabi, United Arab Emirates
Lifecycle StatusPreconstructionActual
Preconstruction
Reported Capacity5,000 MWProposal
5,000 MW
Capacity BasisPlanned full build campus envelopeActual
Planned full build campus envelope
Project IdentityG42 UAE–US AI CampusActual
G42 UAE–US AI Campus
Lifecycle StatusDevelopment programActual
Development program
LocationAbu Dhabi, AEActual
Abu Dhabi, AE
Participant RolesG42, Khazna Data CentersActual
G42, Khazna Data Centers
Capacity5,000 MWProposal
5,000 MW
Capacity Basis5,000 MW planned full development campus envelopeActual
5,000 MW planned full development campus envelope
Development ScaleG42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.SActual
G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.S
InfrastructureThe campus remains a development program rather than an operating 5 GW facility.Actual
The campus remains a development program rather than an operating 5 GW facility.