G42 UAE–US AI Campus

Abu Dhabi, United Arab EmiratesPreconstruction
Evidence
Planned / design
5,000 MW
Updated
Oct 28, 2026

G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.S. technology companies expected to operate facilities and nuclear, solar and gas resources proposed for supply. The campus remains a development program rather than an operating 5 GW facility.

The 5 GW figure describes the full host-campus envelope. The planned Stargate cluster sits within it and must not be added to that figure. Related record

Capacity

Reported capacity

Planned / design or future potential

5,000 MW

Source

Capacity

Planned / design or future potential

5,000 MW

Source

Capacity basis

Planned / design or future potential

5,000 MW planned full development campus envelope

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

G42 UAE–US AI Campus: Development program.

Milestones (2)
G42 UAE–US AI Campus — Development program

Date not disclosed · Event timing type not established

In progress · Announced

Source not linked
G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles.

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Site & development

Location context

Actual

Abu Dhabi, United Arab Emirates

Source

Location

Actual

Abu Dhabi, AE

Source

Development scale

Actual

G42 is leading a consortium developing a planned 5 GW AI campus in Abu Dhabi across roughly ten square miles. The first phase is planned at 1 GW, with U.S

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Planned full build campus envelope

Source

Project identity

Actual

G42 UAE–US AI Campus

Source

Lifecycle status

Actual

Development program

Source

Participant roles

Actual

G42, Khazna Data Centers

Source

Infrastructure

Actual

The campus remains a development program rather than an operating 5 GW facility.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

5,000 MW

5,000 MW planned full-development campus envelope

Site facility

Planned or represented

The campus remains a development program rather than an operating 5 GW facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.