Data center siteSite record

eStruxture CAL-3 Rocky View

Calgary metropolitan area, Alberta, CanadaUnder construction
Capacity
No public figure
Lead participant
eStruxture Data Centers
Operator
Last updated
Aug 25, 2026
Most recent public record update

About eStruxture CAL-3 Rocky View

eStruxture's CAL-3 facility is under construction in Rocky View County with 90 MW of total power and CoreWeave anchoring an undisclosed portion of Phase 1. Opening remains targeted for fall 2026.

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

2 phases · 4 milestones
Phase 1Under Construction

CoreWeave allocation is undisclosed and must not be inferred from the 90 MW facility total.

Remaining CAL-3 capacityAnnounced Or Preconstruction

Balance of the 90 MW total-power facility after the undisclosed Phase 1 allocation; not delivered or committed by default.

Jan 1, 2024
Government register places project in 2024-2026 construction window
Completed
Nov 15, 2024
CAL-3 announced
Completed
May 14, 2026
CoreWeave announced for a portion of Phase 1
Completed
Jul 1, 2026
CAL-3 target opening
Forecast

Infrastructure

Electric GridUnder Construction

90 MW total power

Facility design/total power; government generation wording is not accepted as onsite generation evidence.

Cooling SystemUnder Construction

125 kW+ per cabinet

Maximum cabinet-density design with liquid-cooling support.

FiberPlanned Or Represented

Planned network/interconnection with CAL-1 and CAL-2; implementation status not publicly disclosed.

Project map

1 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2
Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

11 facts
Facility Total Power
90 MW total power
Fact
Status
Construction
Actual
Target Opening
Fall / H2 2026
Fact
Tier Design
Tier III-designed
Actual
Anchor Tenant
CoreWeave
Actual
Anchor Tenant Scope
Portion of Phase 1
Actual
Representative Data Hall Area
8,625 square feet approximately
Fact
Latitude
51.21 decimal degrees
Fact
Longitude
-113.91 decimal degrees
Fact
Carrier Neutral
True
Fact
Capacity Boundary Decision
90 MW facility total power; CoreWeave portion of Phase 1 undisclosed; no operating capacity claimed
Actual