Beacon Indus AI Data Center Hub
Preconstruction · About 3.2 km east of Calgary and 2.4 km northwest of Indus, Alberta, Canada
eStruxture's CAL-3 facility is under construction in Rocky View County with 90 MW of total power and CoreWeave anchoring an undisclosed portion of Phase 1. Opening remains targeted for fall 2026.
Projects sharing a market, utility, or organization.
Preconstruction · About 3.2 km east of Calgary and 2.4 km northwest of Indus, Alberta, Canada
No additional capacity claims are published.
CoreWeave allocation is undisclosed and must not be inferred from the 90 MW facility total.
Balance of the 90 MW total-power facility after the undisclosed Phase 1 allocation; not delivered or committed by default.
90 MW total power
Facility design/total power; government generation wording is not accepted as onsite generation evidence.
125 kW+ per cabinet
Maximum cabinet-density design with liquid-cooling support.
Planned network/interconnection with CAL-1 and CAL-2; implementation status not publicly disclosed.
Published claims and their source links.