Fibernet MercuryDelta Campus

Delta, Utah, United StatesProposed
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Fibernet’s MercuryDelta program describes multiple Utah data center campuses using onsite generation, with the Sunnyside/Delta-area site presented as an early location. Company material supports campuses ranging from roughly 100,000 to one million square feet and onsite generation up to about 1.5 GW per site, not the previously tracked 2 GW IT figure. Because the precise physical identity and current schedule are unclear, The available public sources do not establish a single project-scoped capacity figure.5 GW generation ceiling. Land, permits, customer, fuel, water and active construction status need confirmation.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Program and site-identity verificationAnnounced or preconstruction

Fibernet’s MercuryDelta program describes multiple Utah data center campuses using onsite generation, with the Sunnyside/Delta-area site presented as an early location. Company material supports campuses ranging from roughly 100,000 to one million square feet and onsite generation up to about 1.5 GW per site, not the previously tracked 2 GW IT figure. Because the precise physical identity and current schedule are unclear, The available public sources do not establish a single project-scoped capacity figure.5 GW generation ceiling. Land, permits, customer, fuel, water and active construction status need confirmation.

Participants

Fibernet

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Fibernet MercuryDelta Campus | Delta | Utah | US

Source

Location context

Actual

Fibernet MercuryDelta Campus | Delta | Utah | US

Source

Program site count min

Actual

3 sites

Source

Site floor area range

Actual

100,000–1,000,000 Square feet

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

2,000 MW future full build site capacity; not measured operating IT load.

Source

Lifecycle status

Actual

Proposed

Source

Infrastructure & permits

Technical details (1)
Onsite generation

Planned or represented

1,500 MW

Company-published per-site generation ceiling; not IT load.

Public-source research. Plans may change. See Evidence for sources and qualifications.