Skip to content
All records
Data center siteSite record

Global Switch London East

London, England, United KingdomOperating / Stabilized
Capacity
87 MW
Planned critical IT
Lead participant
Global Switch
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Global Switch London East

Global Switch London East is the 87 MW operating anchor at Nutmeg Lane. The profile includes its environmental permit and current solar-PPA context while keeping contracted renewable supply separate from IT capacity. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load87 MWDesign · Global Switch London East
It Load87 MWDesign · Global Switch London East

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Global Switch London East is the 87 MW operating anchor at Nutmeg Lane. The profile includes its environmental permit and current solar-PPA context while keeping contracted renewable supply separate from IT capacity. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

87 MW

87 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
Global Switch House | London | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
87 MW
Design
Capacity Basis
Global Switch publishes 87 MW for this project boundary.
Actual
Location Context
Global Switch House | London | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
87 MW
Design
Capacity Basis
87 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
Global Switch
Actual
Project Location
London, England, GB
Actual
Current Lifecycle
Operating
Actual
Capacity Classification
It load
Actual
Capacity Basis
87 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Renewable Ppa Term
10 years
Actual