Evidence
Planned critical IT
87 MW
Updated
Oct 28, 2026

Global Switch London East is the 87 MW operating anchor at Nutmeg Lane. The profile includes its environmental permit and current solar-PPA context while keeping contracted renewable supply separate from IT capacity. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Capacity

Reported capacity

Design

87 MW

Source

Reported capacity

Design

87 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

Global Switch London East is the 87 MW operating anchor at Nutmeg Lane. The profile includes its environmental permit and current solar-PPA context while keeping contracted renewable supply separate from IT capacity. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Participants

Global Switch

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Global Switch House | London | England | GB

Source

Location context

Actual

Global Switch House | London | England | GB

Source

Project location

Actual

London, England, GB

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

Global Switch publishes 87 MW for this project boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

87 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

Global Switch

Source

Current lifecycle

Actual

Operating

Source

Capacity classification

Actual

It load

Source

Capacity basis

Actual

87 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Identity boundary

Actual

This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Source

Source refresh date

Actual

2026-08-29

Source

Renewable PPA term

Actual

10 years

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

87 MW

87 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling system

Operational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Air authorization · Issued

Global Switch London East

Environment Agency

Apr 26, 2024

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Global Switch London North

Operating · London, England, United Kingdom

Same locality: London · Shared participant: Global Switch

Compare in a collection
Global Switch London South

Preconstruction · London, England, United Kingdom

Same locality: London · Shared participant: Global Switch

Compare in a collection