Equinix MD5 Alcobendas

Alcobendas, Community of Madrid, SpainOperating / StabilizedDiligence evidence / compare baseline
Capacity
No public figure
Lead participant
Equinix, Inc.
Developer · Operator
Last updated
Sep 12, 2026
Most recent public record update

About Equinix MD5 Alcobendas

Equinix MD5 is an operating IBX data center at the company’s Alcobendas campus near Madrid, officially inaugurated in May 2026. The facility provides more than 4,400 square metres of colocation space and was announced with N+1 electrical redundancy, N+1 cooling redundancy and a 5+1 backup-generator configuration. Equinix states that its Spanish facilities, including MD5, are covered by 100% renewable energy and cites availability above 99.999%. The company’s €460 million investment figure applies to the broader Alcobendas campus rather than MD5 alone.

Projects sharing a market, utility, or organization.

2 related

Capacity

Operating capacityNo reviewed operating IT-capacity value is included in this record.

No additional capacity claims are published.

Development

1 phases · 1 milestones
MD5 operating facilityOperational

Operating MD5 facility within the Alcobendas campus.

May 22, 2026
Equinix inaugurated MD5
Completed

Infrastructure

Electric GridOperational

N+1 electrical redundancy.

Onsite GenerationOperational

Backup generators configured 5+1.

Cooling SystemOperational

N+1 cooling redundancy.

FiberOperational

MD5 is integrated into Equinix's Madrid interconnection ecosystem; the >70-provider figure is reported for metro/campus context rather than MD5 specifically.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
0
Capacity figures
0

No map point available

Power & interconnection: 1Generation & storage: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Claim review and source dates are shown separately. A record update date is not a claim review date.

7 facts
Colocation Area Minimum
4,400 square meters
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158143
Campus Investment Context
€460,000,000
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158144
Electrical Redundancy
N+1
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158145
Cooling Redundancy
N+1
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158146
Backup Generator Configuration
5+1
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158147
Renewable Energy Coverage
100 percent
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158148
Availability Claim Minimum
100 percent
actual
Claim review
Approved
Claim date
Physical subject
Equinix MD5 Alcobendas · Project
Claim reference
158149