Global Switch Madrid 1

Madrid, Community of Madrid, SpainOperating
Evidence
Planned critical IT
14 MW
Updated
Oct 28, 2026

Global Switch Madrid 1 is the existing 14 MW operating facility. The adjacent 56 MW Madrid 2 construction program remains a separate project and does not change Madrid 1’s identity or capacity. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Capacity

Reported capacity

Design

14 MW

Source

Reported capacity

Design

14 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

Global Switch Madrid 1 is the existing 14 MW operating facility. The adjacent 56 MW Madrid 2 construction program remains a separate project and does not change Madrid 1’s identity or capacity. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Milestones (1)
Adjacent Madrid 2 broke ground without changing Madrid 1 identity

Jun 18, 2026 · Recorded actual event

Completed · Announced

Source not linked

Participants

Global Switch

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Global Switch Madrid 1 | Madrid | Community of Madrid | ES

Source

Location context

Actual

Global Switch Madrid 1 | Madrid | Community of Madrid | ES

Source

Project location

Actual

Madrid, Community of Madrid, ES

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

Global Switch publishes 14 MW for this project boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

14 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

Global Switch

Source

Current lifecycle

Actual

Operating

Source

Capacity classification

Actual

It load

Source

Capacity basis

Actual

14 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Identity boundary

Actual

This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Source

Source refresh date

Actual

2026-08-29

Source

Campus role

Actual

Operating first Madrid building

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

14 MW

14 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling system

Operational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
Global Switch Madrid 2

Under construction · Madrid, Community of Madrid, Spain

Same locality: Madrid · Shared participant: Global Switch

Compare in a collection