Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 8 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

CyrusOne OCB1 Council Bluffs Data CenterSite · Connected record
Council Bluffs, Iowa, United States
CyrusOne
Operating
9 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
CyrusOne PAR1 Paris Data Center CampusSite · Connected record
Wissous, Île-de-France, France
CyrusOne
Partially operational
27 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
CyrusOne PHX1–PHX8 Chandler Data Center CampusSite · Connected record
Chandler, Arizona, United States
CyrusOne
Partially operational
169 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
CyrusOne PNW1 Quincy Data Center CampusSite · Connected record
Quincy, Washington, United States
CyrusOneGrant County Public Utility District
Partially operational
36 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
CyrusOne SAT1 San Antonio Data CenterSite · Connected record
San Antonio, Texas, United States
CyrusOne
Operating
9 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
CyrusOne SAT2–SAT4 San Antonio Data Center CampusSite · Connected record
San Antonio, Texas, United States
CyrusOne
Partially operational
36 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
CyrusOne SAT5–SAT6 San Antonio Data Center CampusSite · Connected record
San Antonio, Texas, United States
CyrusOne
Partially operational
33 MW
Basis: Critical ITPlanned critical IT
CyrusOne
Oct 28, 2026
Dahlgren West CampusSite · Connected record
King George, Virginia, United States
Oasis Digital Properties
Proposed
Not establishedIn published records
Oasis Digital Properties
Oct 28, 2026
DAMAC Digital Cikarang AI Data CenterSite · Connected record
Cikarang, West Java, Indonesia
DAMAC DigitalJLL
Preconstruction
144 MW
Basis: Basis not specifiedPlanned / design
DAMAC Digital
Oct 28, 2026
DAMAC Digital Laguna AI Data CenterSite · Connected record
Laguna, Philippines
DAMAC Digital
Proposed
250 MW
Basis: Basis not specifiedPlanned / design
DAMAC Digital
Oct 28, 2026
DartPoints BTR01 Baton Rouge Data CenterSite · Connected record
Baton Rouge, Louisiana, United States
DartPoints
Operating
0.5 MW
Basis: Critical ITPlanned critical IT
DartPoints
Oct 28, 2026
DartPoints BTR02 Baton Rouge Data CenterSite · Connected record
Baton Rouge, Louisiana, United States
DartPoints
Operating
0.4 MW
Basis: Critical ITPlanned critical IT
DartPoints
Oct 28, 2026
DartPoints CHS01 Charleston Data CenterSite · Connected record
Ladson, South Carolina, United States
DartPoints
Operating
0.1 MW
Basis: Critical ITPlanned critical IT
DartPoints
Oct 28, 2026
DartPoints CVG01 Cincinnati Data CenterSite · Connected record
Cincinnati, Ohio, United States
DartPoints
Operating
0.2 MW
Basis: Critical ITPlanned critical IT
DartPoints
Oct 28, 2026
DartPoints GSP01 Greenville Data CenterSite · Connected record
Greenville, South Carolina, United States
DartPoints
Operating
0.2 MW
Basis: Critical ITPlanned critical IT
DartPoints
Oct 28, 2026
Data Center Valley EkibastuzSite · Connected record
Ekibastuz, Kazakhstan
Kazakhstan Ministry of Artificial Intelligence and Digital DevelopmentKazakhtelecom
Preconstruction
1,000 MW
Basis: Basis not specifiedPlanned / design
Kazakhstan Ministry of Artificial Intelligence and Digital Development
Oct 28, 2026
Data CitySite · Connected record
Laredo, Texas, United States
Energy Abundance
Proposed
5,000 MW
Basis: Basis not specifiedPlanned / design
Energy Abundance
Oct 28, 2026
DATA4 ATH1 Paiania CampusSite · Connected record
Paiania, Athens metropolitan area, Greece
DATA4 Group
Preconstruction
90 MW
Basis: Basis not specifiedPlanned / design
DATA4 Group
Oct 28, 2026
DATA4 Escaudain AI CampusSite · Connected record
Escaudain, Hauts-de-France, France
Brookfield Asset ManagementDATA4 Group
Preconstruction
700 MW
Basis: Basis not specifiedPlanned / design
DATA4 Group
Oct 28, 2026
DATA4 Europe Growth and Financing ProgramProgram · Connected record
Europe
Brookfield Asset ManagementDATA4 Group
Status under review
Not establishedIn published records
DATA4 Group
Oct 28, 2026
DATA4 Frankfurt–Hanau CampusSite · Connected record
Hanau / Großauheim, Hesse, Germany
Brookfield InfrastructureCity of Hanau
Construction
Not establishedIn published records
P3 Logistic Parks
Oct 28, 2026
DATA4 MIL01 Cornaredo CampusSite · Connected record
Cornaredo, Milan metropolitan area, LOM, Italy
Arjun Infrastructure PartnersBrookfield Infrastructure
Partially operational
Not establishedIn published records
DATA4 Group
Oct 28, 2026
DATA4 PAR03 Nozay AI CampusSite · Connected record
Nozay, Île-de-France, France
Brookfield Asset ManagementCommune of Nozay
Preconstruction
250 MW
Basis: Basis not specifiedPlanned / design
DATA4 Group
Oct 28, 2026
DATA4 Paris-Saclay Campus ClusterProgram · Connected record
Marcoussis and Nozay, Île-de-France, France
Brookfield Asset ManagementDATA4 Group
Status under review
Not establishedIn published records
DATA4 Group
Oct 28, 2026
DATA4 Warsaw Jawczyce CampusSite · Connected record
Jawczyce, Warsaw metropolitan area, Poland
DATA4 Group
Partially operational
60 MW
Basis: Critical ITPlanned critical IT
DATA4 Group
Oct 28, 2026
DataBank DFW2 Richardson Data CenterSite · Connected record
Richardson, Texas, United States
DataBank
Operating
4.3 MW
Basis: Critical ITPlanned critical IT
DataBank
Oct 28, 2026
DataBank DFW3 Plano Data CenterSite · Connected record
Plano, Texas, United States
DataBank
Operating
12 MW
Basis: Critical ITPlanned critical IT
DataBank
Oct 28, 2026
DataBank IAD1 Ashburn Data CenterSite · Connected record
Ashburn, Virginia, United States
DataBank
Operating
9.9 MW
Basis: Critical ITPlanned critical IT
DataBank
Oct 28, 2026
DataBank IAD2 McLean Data CenterSite · Connected record
McLean, Virginia, United States
DataBank Holdings, Ltd.
Operating
3 MW
Basis: Critical ITPlanned critical IT
DataBank Holdings, Ltd.
Oct 28, 2026
DataBank LAS1 Las Vegas Data CenterSite · Connected record
Las Vegas, Nevada, United States
DataBank
Operating
Not establishedIn published records
DataBank
Oct 28, 2026
DataBank LAX2 VernonSite · Connected record
Vernon, California, United States
DataBank Holdings, Ltd.Goodman Group
Construction
32 MW
Basis: Critical ITPlanned critical IT
Goodman Group
Oct 28, 2026
DataBank MSP2 Eagan Data CenterSite · Connected record
Eagan, Minnesota, United States
DataBank
Operating
5 MW
Basis: Critical ITPlanned critical IT
DataBank
Oct 28, 2026
DataBank SLC1 Salt Lake City Data CenterSite · Connected record
Salt Lake City, Utah, United States
DataBank
Operating
Not establishedIn published records
DataBank
Oct 28, 2026
DataBank SLC2 Granite Point Data CenterSite · Connected record
Bluffdale, Utah, United States
DataBank Holdings, Ltd.
Operating
3.3 MW
Basis: Critical ITPlanned critical IT
DataBank Holdings, Ltd.
Oct 28, 2026
Datagrid Southland AI FactorySite · Connected record
Makarewa, Southland, New Zealand
Datagrid New Zealand
Permitted
240 MW
Basis: Critical ITPlanned critical IT
Datagrid New Zealand
Oct 28, 2026
DataVolt Oxagon Net-Zero AI FactorySite · Connected record
Oxagon / NEOM, Saudi Arabia
DataVolt
Construction
1,500 MW
Basis: Basis not specifiedPlanned / design
DataVolt
Oct 28, 2026
DayOne Batam NVIDIA DSX AI Factory CampusSite · Connected record
Batam, KR, Indonesia
BP BatamDayOne Data Centers
Preconstruction
360 MW
Basis: Basis not specifiedPlanned / design
DayOne Data Centers
Oct 28, 2026
DayOne Chonburi Tech Park 1Site · Connected record
Amata City Chonburi Industrial Estate, Chonburi, Thailand
Amata CorporationDayOne Data Centers
Construction
300 MW
Basis: Critical ITPlanned critical IT
DayOne Data Centers
Oct 28, 2026
DayOne Chonburi Tech Park 2Site · Connected record
Chonburi, Thailand
Amata CorporationDayOne Data Centers
Preconstruction
Not establishedIn published records
DayOne Data Centers
Oct 28, 2026
DayOne Chonburi Tech Park ProgramProgram · Connected record
Amata City Chonburi, Chonburi, Thailand
Amata B.Grimm Renewable EnergyDayOne Data Centers
Status under review
Not establishedIn published records
DayOne Data Centers
Oct 28, 2026
DayOne Fuchu Tokyo CampusSite · Connected record
Fuchu / Kodaira, Tokyo, Japan
DayOne Data CentersGaw Capital Partners
Construction
80 MW
Basis: Critical ITPlanned critical IT
DayOne Data Centers
Oct 28, 2026
DayOne Lahti Data Center CampusSite · Connected record
Lahti / Kiveriö, Finland
City of LahtiDayOne Data Centers
Construction
Not establishedIn published records
Kiinteistö Oy Lahden Ilmarisentie 3
Oct 28, 2026
DayOne–Hyperco Kouvola Data CenterSite · Connected record
Kouvola / Koria / Hiivuri, Finland
City of KouvolaDayOne Data Centers
Construction
Not establishedIn published records
DayOne Data Centers
Oct 28, 2026
DC BLOX Conyers Data Center CampusSite · Connected record
Conyers, Georgia, United States
DC BLOXGeorgia Power
Construction
144 MW
Basis: Critical ITPlanned critical IT
DC BLOX
Oct 28, 2026
DC01UK South Mimms Data Center CampusSite · Connected record
South Mimms, England, United Kingdom
DC01UKEquinix, Inc.
Permitted
250 MW
Basis: Basis not specifiedPlanned / design
DC01UK
Oct 28, 2026
DCI Indonesia H2 Karawang CampusSite · Connected record
Pertiwi Lestari Industrial Estate, Karawang, JB, Indonesia
PT Datacenter Indonesia Sukses MakmurPT DCI Indonesia Tbk
Partially operational
600 MW
Basis: Critical ITPlanned critical IT
PT Datacenter Indonesia Sukses Makmur
Oct 28, 2026
Digital Carver Brickyard CampusSite · Connected record
Manassas, Virginia, United States
Digital Realty TrustVirginia Department of Environmental Quality
Construction
192 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Digital Carver Dulles 9 CampusSite · Connected record
Sterling, Virginia, United States
Digital Realty Trust
Construction
96 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Digital Carver Fechenheim CampusSite · Connected record
Frankfurt, Hesse, Germany
BlackstoneDigital Realty Trust
Preconstruction
Not establishedIn published records
Digital Realty Trust
Oct 28, 2026
Digital Carver Les Ulis CampusSite · Connected record
Les Ulis / Paris, Île-de-France, France
BlackstoneDigital Realty Trust
Preconstruction
Not establishedIn published records
Digital Realty Trust
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.