Dahlgren West Campus

King George, Virginia, United StatesProposed
Capacity
No public figure
Lead participant
Oasis Digital Properties
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Dahlgren West Campus

Dahlgren West is an Oasis Digital Properties data center proposal in King George County, Virginia. Public planning records support the campus identity and permit activity, but available project-specific sources do not verify the tracked 1.2 GW figure as operating, contracted or phase-design capacity. Building count, utility delivery, water, air permits, customers, financing and construction schedule require confirmation.

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 0 milestones
Permitting and capacity verificationAnnounced Or Preconstruction

Dahlgren West is an Oasis Digital Properties data center proposal in King George County, Virginia. Public planning records support the campus identity and permit activity, but available project-specific sources do not verify the tracked 1.2 GW figure as operating, contracted or phase-design capacity. The available public sources do not establish a single project-scoped capacity figure. Building count, utility delivery, water, air permits, customers, financing and construction schedule require confirmation.

Infrastructure

Electric GridUnknown

1,200 MW

Secondary estimate; headline withheld.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Dahlgren West Campus | King George | Virginia | US
Actual
Lifecycle Status
Proposed
Actual
Capacity Basis
1,200 MW future full build site capacity; not measured operating IT load.
Actual
Location Context
Dahlgren West Campus | King George | Virginia | US
Actual
Lifecycle Status
Proposed
Actual
Developer
Oasis Digital Properties
Actual
Permit Status
Local planning activity identified
Actual
Capacity Status
1.2 GW remains unverified
Actual