Skip to content

DartPoints GSP01 Greenville Data Center

Greenville, South Carolina, United StatesOperating
Evidence
Planned critical IT
0.2 MW
Updated
Oct 28, 2026

DartPoints GSP01 Greenville Data Center is an operating DartPoints data center facility in Greenville, South Carolina. GSP01 at 78 Global Drive; current operation is separate from the $125M expansion targeting 12.5 MW. The retrofit records reported critical IT capacity: 8.7 MW; current utility power capacity: 2.5 MW; future expanded capacity: 12.5 MW; expansion capex: $125.0 million. Utility service, UPS, standby generation, cooling, facility power and IT load are kept in their source-defined scopes rather than collapsed into one capacity number. Where reliable public evidence for ownership, project financing, permitting, tenants or water arrangements was not established, Cartis records the research gap explicitly instead of inferring a fact. DartPoints' current pages disagree on one or more facility metrics; Cartis retains both source-scoped claims and does not manufacture a single clean headline until reconciled.

Capacity

Reported capacity

Actual

0.2 MW

Source

Reported critical IT capacity

Actual

8.7 MW

Conflicting public evidence

Conflicting source claims

Source

Reported critical IT capacity

Actual

0.19 MW

Conflicting public evidence

Conflicting source claims

Source

Current utility power capacity

Actual

2.5 MW

Source

Future expanded capacity

Planned / design or future potential

12.5 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

GSP01 facilityOperational

Operating data center facility.

12.5 MW expansionUnder construction

$125M expansion adding 88,000 sq ft; expected operation July 2027. Current operating facility remains a separate phase.

Milestones (2)
DartPoints announced the $125M GSP01 expansion to 12.5 MW total capacity.

Nov 12, 2025 · Recorded actual event

facility expansion announced

Completed · Capacity revised

Sources (1)
Operator target for expansion operation; forecast only.

Jul 2027 · Forecast / planned record

expansion operation target

Forecast · Forecast completion

Sources (1)

Participants

DartPoints

Operator

Sources by role
Operator (1)
Operator (1)

Capital & incentives

Capital claims

Expansion capex

Proposal

$125,000,000

Source

Site & development

Data hall area

Actual

27,240 sq. ft.

Source

Expansion area

Proposal

88,000 sq. ft.

Source

Technical specifications

Cooling capacity

Actual

350 tons

Source

Network provider count

Actual

7 providers

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

2.5 MW

Current facility-detail utility-power value; future 12.5 MW expansion stays separate.

Cooling system

Operational

350 tons

Current cooling capacity.

Fiber

Operational

7 providers

Current provider count.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
DartPoints CHS01 Charleston Data Center

Operating · Ladson, South Carolina, United States

Shared participant: DartPoints · Same market: South Carolina, United States

Compare in a collection