CyrusOne SAT1 San Antonio Data Center
- Planned critical IT
- 9 MW
- Updated
- Oct 28, 2026
CyrusOne SAT1 San Antonio Data Center, also known as CyrusOne SAT1, is a data center project in San Antonio, TX, US developed and operated by CyrusOne. San Antonio facility with 9 MW of total IT capacity and operator-described high-density colocation infrastructure. Resilient power and cooling, cloud and internet-exchange connectivity, and multilayer physical security.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
9 MW is the operator-published facility or campus design boundary.
Participants
Developer
Sources by role
Developer (1)
- CyrusOne CyrusOne SAT1 profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (2)
Energized
Resilient power and cooling, cloud and internet-exchange connectivity, and multilayer physical security.
Operational
CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Partially operational · San Antonio, Texas, United States
Same locality: San Antonio · Shared participant: CyrusOne
Compare in a collectionPartially operational · San Antonio, Texas, United States
Same locality: San Antonio · Shared participant: CyrusOne
Compare in a collectionOperating · San Antonio, Texas, United States
Same locality: San Antonio
Compare in a collectionPartially operational · San Antonio, Texas, United States
Same locality: San Antonio
Compare in a collection