CyrusOne PHX1–PHX8 Chandler Data Center Campus

Chandler, Arizona, United StatesPartially operational
Evidence
Planned critical IT
169 MW
Updated
Oct 28, 2026

CyrusOne PHX1–PHX8 Chandler Data Center Campus, also known as CyrusOne Chandler Campus, is a partially operational data center campus in Chandler, AZ, US associated with CyrusOne. Eight-facility campus; approximately 2 million square feet; 169 MW total IT capacity. Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.

Capacity

Reported capacity

Design

169 MW

Source

Reported capacity

Planned / design or future potential

169 MW

Source

Reported capacity

Planned / design or future potential

169 MW

Source

Campus IT design

Planned / design or future potential

169 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

169 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

169 MW is the operator-published facility or campus IT design boundary.

Milestones (2)
PHX8 built out during 2024

2024 · Recorded actual event

Completed · Construction completed

Source not linked
City generator-testing and substation-improvement schedule current

Jan 1, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

CyrusOne

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

CyrusOne PHX1–PHX8 | Chandler | AZ | US

Source

Location context

Actual

CyrusOne PHX1–PHX8 | Chandler | AZ | US

Source

Technical area

Actual

2,000,000 square feet

Source

Masterplan buildings

Forecast

10 buildings

Source

Location context

Actual

CyrusOne Chandler Campus | Chandler | AZ | US

Source

Technical area

Design

2,000,000 square feet

Source

Technical specifications

Cooling water use

Design

Water free design

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

CyrusOne publishes 169 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

169 MW facility or campus design capacity.

Source

Facility count

Actual

8 facilities

Source

Built out in 2024

Actual

PHX8

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

169 MW facility or campus IT design capacity.

Source

Facility count

Actual

8 facilities

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Biometric security, raised-floor data halls, sophisticated power distribution and zero-water cooling systems.

Cooling system

Operational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric grid

Energized

Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Other · Issued

CyrusOne Chandler campus

City of Chandler

Jan 1, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.