CyrusOne PHX1–PHX8 Chandler Data Center Campus

Chandler, Arizona, United StatesPartially operational
Capacity
169 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne PHX1–PHX8 Chandler Data Center Campus

CyrusOne PHX1–PHX8 Chandler Data Center Campus, also known as CyrusOne Chandler Campus, is a partially operational data center campus in Chandler, AZ, US associated with CyrusOne. Eight-facility campus; approximately 2 million square feet; 169 MW total IT capacity. Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load169 MWDesign · CyrusOne PHX1–PHX8 Chandler Data Center Campus
Design169 MWDesign · CyrusOne PHX1–PHX8 Chandler Data Center Campus
Design169 MWDesign · CyrusOne PHX1–PHX8 Chandler Data Center Campus
Design169 MWDesign · CyrusOne PHX1–PHX8 Chandler Data Center Campus

Development

2 phases · 4 milestones
Operating facility and documented expansionOperational

169 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

169 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Dec 31, 2024
PHX8 built out during 2024
Completed
Jan 1, 2026
City generator-testing and substation-improvement schedule current
Completed
Aug 27, 2026
Primary project source reviewed for CyrusOne Chandler Campus
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Biometric security, raised-floor data halls, sophisticated power distribution and zero-water cooling systems.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

20 facts
Location Context
CyrusOne PHX1–PHX8 | Chandler | AZ | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
169 MW
Design
Capacity Basis
CyrusOne publishes 169 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne PHX1–PHX8 | Chandler | AZ | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
169 MW
Design
Capacity Basis
169 MW facility or campus design capacity.
Actual
Facility Count
8 facilities
Actual
Technical Area
2,000,000 square feet
Actual
Masterplan Buildings
10
Forecast
Built Out In 2024
PHX8
Actual
Location Context
CyrusOne Chandler Campus | Chandler | AZ | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
169 MW
Design
Capacity Basis
169 MW facility or campus IT design capacity.
Actual
Facility Count
8 facilities
Actual
Technical Area
2,000,000 square feet
Design
Campus It Design
169 MW
Design
Cooling Water Use
Water free design