CyrusOne PHX1–PHX8 Chandler Data Center Campus
About CyrusOne PHX1–PHX8 Chandler Data Center Campus
CyrusOne PHX1–PHX8 Chandler Data Center Campus, also known as CyrusOne Chandler Campus, is a partially operational data center campus in Chandler, AZ, US associated with CyrusOne. Eight-facility campus; approximately 2 million square feet; 169 MW total IT capacity. Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.
Capacity
Planned / designDevelopment
2 phases · 4 milestones169 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
169 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
Infrastructure
Biometric security, raised-floor data halls, sophisticated power distribution and zero-water cooling systems.
CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.
Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.