Planned / design
144 MW
Updated
Oct 28, 2026

DAMAC Digital acquired a 50,000-square-metre site in Cikarang, West Java for an AI-oriented data center campus. The planned investment exceeds $2.3 billion and the design calls for more than 144 MW of capacity.

Capacity

Reported capacity

Planned / design or future potential

144 MW

Source

Capacity

Planned / design or future potential

144 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

DAMAC Digital Cikarang AI Data Center: Preconstruction.

Milestones (2)
DAMAC Digital Cikarang AI Data Center: Development-stage campus following land acquisition.

Jul 21, 2025 · Event timing type not established

In progress · Announced

Source not linked
DAMAC Digital Cikarang AI Data Center — Preconstruction

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

DAMAC Digital

Developer

Sources by role
Developer (1)
Other participants (1)
JLL

Contractor

Sources by role
Contractor (1)

Site & development

Location context

Actual

DAMAC Digital site | Cikarang | Bekasi | West Java | Indonesia

Source

Location

Actual

Cikarang, West Java, ID

Source

Development scale

Actual

50,000-Square metre site; projected capacity above 144 MW

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

JLL states projected capacity exceeding 144 MW; stored as a floor.

Source

Project identity

Actual

DAMAC Digital Cikarang AI Data Center

Source

Lifecycle status

Actual

Preconstruction

Source

Participant roles

Actual

DAMAC Digital, JLL

Source

Capacity basis

Actual

144 MW planned or design IT capacity

Source

Infrastructure

Actual

AI-focused campus planned within the Cikarang industrial market.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

144 MW

144 MW planned or design IT capacity

Site facility

Planned or represented

AI-focused campus planned within the Cikarang industrial market.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Digital Edge CGK Campus

Under construction · Cikarang, West Java, Indonesia

Same locality: Cikarang

Compare in a collection
STT Jakarta 1 Data Center

Operating · Cikarang, West Java, Indonesia

Same locality: Cikarang

Compare in a collection
STT Jakarta 2 Data Center

Operating · Cikarang, West Java, Indonesia

Same locality: Cikarang

Compare in a collection
STT Jakarta 3 Data Center

Under construction · Cikarang, West Java, Indonesia

Same locality: Cikarang

Compare in a collection