Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

1,043 results · Page 20 of 21
Capacity stages and scopes differ; do not add figures together. How to compare

724 of 1043 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Tract Silver Springs Technology ParkSite · Connected record
Silver Springs, Nevada, United States
Tract
Preconstruction
1,600 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Tuckahoe Technology ParkSite · Connected record
Manakin-Sabot, Virginia, United States
Tract
Proposed
900 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
TRG HOU1 Houston Data CenterSite · Connected record
Spring, Texas, United States
TRG Datacenters
Operating
6 MW
Basis: Utility / grid serviceUtility capacity
TRG Datacenters
Oct 28, 2026
True IDC Eastern Economic Corridor AI Data CenterSite · Connected record
Chonburi, Thailand
True IDC
Construction
250 MW
Basis: Basis not specifiedPlanned / design
True IDC
Oct 28, 2026
US Signal AZ01 Phoenix Data CenterSite · Connected record
Gilbert, Arizona, United States
US Signal
Operating
0.5 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal IA01 Des Moines Data CenterSite · Connected record
Waukee, Iowa, United States
US Signal
Operating
0.2 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
US Signal IN01 Indianapolis Data CenterSite · Connected record
Indianapolis, Indiana, United States
US Signal
Operating
0.3 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal IN02 Indianapolis Data CenterSite · Connected record
Indianapolis, Indiana, United States
US Signal
Operating
1.6 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal MI03 Detroit Data CenterSite · Connected record
Belleville, Michigan, United States
US Signal
Operating
1.5 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal MN01 Minneapolis Data CenterSite · Connected record
Eden Prairie, Minnesota, United States
US Signal
Operating
0.5 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
US Signal OR01 Bend Data CenterSite · Connected record
Bend, Oregon, United States
US Signal
Operating
Not establishedIn published records
US Signal
Oct 28, 2026
US Signal WI02 Madison Data CenterSite · Connected record
Fitchburg, Wisconsin, United States
US Signal
Operating
0.6 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
ValorC3 St. George Data CenterSite · Connected record
St. George, Utah, United States
ValorC3
Operating
4 MW
Basis: Basis not specifiedPlanned / design
ValorC3
Oct 28, 2026
Vantage BER1 Berlin Data Center CampusSite · Connected record
Berlin area, Brandenburg, Germany
Vantage Data Centers
Partially operational
56 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage BER2 Mittenwalde Data Center CampusSite · Connected record
Mittenwalde, Brandenburg, Germany
Vantage Data Centers
Partially operational
32 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CA1 Santa Clara Data Center CampusSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Operating
77 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CA2 Santa Clara Data Center CampusSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Partially operational
75 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CA3 Santa Clara Data CenterSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Construction
64 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CWL1 Cardiff Data Center CampusSite · Connected record
Newport, Wales, United Kingdom
Vantage Data Centers
Partially operational
148 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage DUB1 Dublin Data Center CampusSite · Connected record
Profile Park, Dublin, County Dublin, Ireland
Vantage Data Centers
Partially operational
52 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage FRA1 Offenbach Data Center CampusSite · Connected record
Offenbach am Main, Hesse, Germany
Vantage Data Centers
Partially operational
56 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage FRA2 Raunheim Data Center CampusSite · Connected record
Raunheim, Hesse, Germany
Vantage Data Centers
Construction
56 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage FrontierSite · Connected record
Texas, United States

Overlapping scope — see profile before aggregating

Vantage Data Centers
Construction
1,400 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage Frontier / Stargate ShackelfordSite · Sourced research
Shackelford County, Texas, United States

Overlapping scope — see profile before aggregating

Vantage Data CentersOracle
Under construction
1,400 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG1 On Lok Data CenterSite · Connected record
Fanling, New Territories, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
5 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG2 Fo Tan Data CenterSite · Connected record
Fo Tan, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
13 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG3 Kwai Chung Data CenterSite · Connected record
Kwai Chung, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
14 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage JHB1 Johor Data Center CampusSite · Connected record
Sedenak, Johor, Malaysia
Abu Dhabi Investment AuthorityGIC
Partially operational
300 MW+
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage JNB1 Johannesburg Data Center CampusSite · Connected record
Midrand, Johannesburg, Gauteng, South Africa
EskomVantage Data Centers
Partially operational
120 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage JNB2 Johannesburg Data CenterSite · Connected record
Isando, Ekurhuleni, Gauteng, South Africa
Municipality of EkurhuleniSolarAfrica
Partially operational
20 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage KIX1 Facility 1Site · Connected record
Ibaraki, Osaka, Japan
Vantage Data Centers
Construction
Not establishedIn published records
Vantage Data Centers
Oct 28, 2026
Vantage KIX1 Facility 2Site · Connected record
Ibaraki, Osaka, Japan
Vantage Data Centers
Preconstruction
Not establishedIn published records
Vantage Data Centers
Oct 28, 2026
Vantage KIX1 Osaka CampusSite · Connected record
Ibaraki, Osaka, Japan
Vantage Data Centers
Construction
Not establishedIn published records
Vantage Data Centers
Oct 28, 2026
Vantage KUL1 Cyberjaya Data Center CampusSite · Connected record
Cyberjaya, Selangor, Malaysia
Tenaga Nasional BerhadVantage Data Centers
Operating
31 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage KUL2 CyberjayaSite · Connected record
Cyberjaya, Selangor, SGR, Malaysia
Tenaga Nasional BerhadVantage Data Centers
Construction
436 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage LHR1 London Data Center CampusSite · Connected record
North Acton, London, England, United Kingdom
Vantage Data Centers
Partially operational
55 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage LHR2 London Data CenterSite · Connected record
Park Royal, London, England, United Kingdom
Vantage Data Centers
Operating
20 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage Lighthouse CampusSite · Connected record
Port Washington, Wisconsin, United States
OpenAIOracle
Construction
902 MW
Basis: Critical ITPlanned critical IT
Oracle
Oct 28, 2026
Vantage Lighthouse Port Washington AI Data Center CampusSite · Connected record
Port Washington, Wisconsin, United States
Vantage Data Centers
Construction
902 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage MEL1 Melbourne Data Center CampusSite · Connected record
Tullamarine, Melbourne, Victoria, Australia
JemenaPrime Electrical & Data
Construction
64 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage Millersport CampusSite · Connected record
Fairfield, Ohio, United States
Vantage Data Centers
Proposed
696 MW
Basis: Basis not specifiedPlanned / design
Vantage Data Centers
Oct 28, 2026
Vantage MXP1 Milan Data Center CampusSite · Connected record
Melegnano, Milan, Lombardy, Italy
Vantage Data Centers
Partially operational
64 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage MXP2 Milan Data Center CampusSite · Connected record
Castelletto, Milan, Lombardy, Italy
DueretiTerna
Construction
32 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage NV1 Reno CampusSite · Connected record
Sparks / Reno market, Nevada, United States
Economic Development Authority of Western NevadaNV Energy
Construction
224 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage OH1 New Albany Data Center CampusSite · Connected record
New Albany, Ohio, United States
Vantage Data Centers
Partially operational
192 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage Phoenix AZ1 GoodyearSite · Connected record
45 South Bullard Avenue, Goodyear, Arizona, United States
Arizona Public ServiceCorgan
Partially operational
176 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage QC1 Montreal Data CenterSite · Connected record
Montreal, Quebec, Canada
Hydro-QuébecVantage Data Centers
Operating
11 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage QC2 Quebec City Data Center CampusSite · Connected record
Quebec City, Quebec, Canada
Hydro-QuébecVantage Data Centers
Partially operational
86 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage QC4 Montreal Data Center CampusSite · Connected record
Montreal, Quebec, Canada
Hydro-QuébecVantage Data Centers
Partially operational
50 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage QC6 Montreal Data CenterSite · Connected record
Montreal, Quebec, Canada
Hydro-QuébecVantage Data Centers
Operating
30 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.