Data center siteSite record

Vantage QC1 Montreal Data Center

Montreal, Quebec, CanadaOperating / Stabilized
Capacity
11 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage QC1 Montreal Data Center

Vantage QC1 Montreal Data Center, also known as Vantage QC1 Montreal I, is a data center project in Montreal, QC, CA associated with Vantage Data Centers. Five-acre purpose-built facility; 60,000 square feet; 11 MW critical IT load; Uptime Institute Tier III certifications. Hydro-Quebec power, N+1 electrical and mechanical redundancy and extensive use of free-air cooling.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load11 MWDesign · Vantage QC1 Montreal Data Center
Design11 MWDesign · Vantage QC1 Montreal Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

11 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for Vantage QC1 Montreal I
Completed

Infrastructure

Electric GridEnergized

Hydro-Quebec power, N+1 electrical and mechanical redundancy and extensive use of free-air cooling.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridEnergized

11 MW IT design

Hydro-Québec service with N+1 redundancy and free-air cooling.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Vantage QC1 Montreal I | Montreal | QC | CA
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
11 MW
Design
Capacity Basis
Vantage Data Centers publishes 11 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage QC1 Montreal I | Montreal | QC | CA
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
11 MW
Design
Capacity Basis
11 MW facility or campus design capacity.
Actual
Project Boundary
Vantage QC1 Montreal I
Actual
Location Context
Montreal, QC, CA
Actual
Lifecycle Status
Operating
Actual
Development Detail
Five acre purpose built facility; 60,000 square feet; 11 MW critical IT load; Uptime Institute Tier III certifications.
Actual
Capacity Basis
11 MW facility or campus design capacity.
Actual