Vantage MXP1 Milan Data Center Campus

Melegnano, Milan, Lombardy, ItalyPartially operational
Capacity
64 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage MXP1 Milan Data Center Campus

Vantage MXP1 Milan Data Center Campus, also known as Vantage MXP1 Milan I, is a data center project in Melegnano, Milan, Lombardy, IT associated with Vantage Data Centers. 30-acre campus; four data centers at full development; 517,000 square feet; 64 MW critical IT load. 220 kV onsite substation, multiple utility feeds, closed-loop chilled-water cooling and carrier-neutral connectivity. 64 MW is the operator’s campus specification and is consistent with the 96 MW combined Milan portfolio after MXP2. A 32 MW building-level figure in a translated sheet is retained as phase context, not substituted for the campus boundary.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load64 MWDesign · Vantage MXP1 Milan Data Center Campus
Design64 MWDesign · Vantage MXP1 Milan Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

64 MW is the operator’s campus specification and is consistent with the 96 MW combined Milan portfolio after MXP2. A 32 MW building-level figure in a translated sheet is retained as phase context, not substituted for the campus boundary.

Aug 28, 2026
Current source record reviewed for Vantage MXP1 Milan I
Completed

Infrastructure

Electric GridEnergized

220 kV onsite substation, multiple utility feeds, closed-loop chilled-water cooling and carrier-neutral connectivity.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Vantage MXP1 Milan I | Melegnano, Milan | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
64 MW
Design
Capacity Basis
Vantage Data Centers publishes 64 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage MXP1 Milan I | Melegnano, Milan | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
64 MW
Design
Capacity Basis
64 MW is the operator’s campus specification and is consistent with the 96 MW combined Milan portfolio after MXP2. A 32 MW building level figure in a translated sheet is retained as phase context, not substituted for the campus boundary.
Actual
Project Boundary
Vantage MXP1 Milan I
Actual
Location Context
Melegnano, Milan, Lombardy, IT
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
30-Acre campus; four data centers at full development; 517,000 square feet; 64 MW critical IT load.
Actual
Capacity Basis
64 MW is the operator’s campus specification and is consistent with the 96 MW combined Milan portfolio after MXP2. A 32 MW building level figure in a translated sheet is retained as phase context, not substituted for the campus boundary.
Actual