Data center siteSite record

Vantage NV1 Reno Campus

Sparks / Reno market, Nevada, United StatesUnder construction
Capacity
224 MW
Planned critical IT
Lead participant
Vantage Data Centers
Operator
Last updated
Aug 26, 2026
Most recent public record update

About Vantage NV1 Reno Campus

Vantage announced a four-building, 224 MW AI campus in Storey County, Nevada in July 2025. The operator continues to list the first facility for a second-quarter 2026 opening.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential224 MWForecast · Vantage NV1 Reno Campus
Utility Service500 MWForecast · Vantage NV1 Reno Campus

Development

3 phases · 2 milestones
NV1 first facilityPlanned

The first two buildings were described as fully leased at announcement, but only the first had a target opening.

1 building

NV1 second facilityPlanned

No opening or capacity allocation is inferred.

1 building

NV1 full campusPlanned

Full-campus envelope, not operating capacity.

4 buildings

Jul 15, 2025
Vantage announces NV1 and first-two-building lease status
Completed
Apr 1, 2026
Current page retains a future opening target
Completed

Infrastructure

Electric GridPlanned Or Represented

224 MW IT

Four-building campus envelope; not current live capacity.

Electric GridPlanned Or Represented

500 MW utility

Current page uses future tense; utility basis, not IT load.

Compute And Platform SystemPlanned Or Represented

AI design range, not aggregate capacity. Source wording: 360–720+ W/ft². Canonical capacity is blank because this is a design range with an open upper bound, not one additive value.

Cooling SystemPlanned Or Represented

Closed-loop chilled water with optional liquid-to-liquid/CDU support.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Cooling & water: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Development Status
Construction / delivery unverified
Actual
Site Area
137 acres
Actual
Building Count
4 facilities
Forecast
Gross Area
1,100,000 square feet
Forecast
Critical It Load
224 MW
Forecast
First Two Buildings Lease Status
Fully leased
Actual
First Facility Target Opening
2026-Q2
Forecast
On Site Substation Capacity
500 MW
Forecast
Power Provider
NV Energy
Forecast
Project Investment
$nearly 3000000000
Transaction Scope
Power Density Range
360 To 720+ W/ft²
Reported Rounded
Cooling Design
Closed loop chilled water with liquid cooling option
Design