Vantage QC2 Quebec City Data Center Campus

Quebec City, Quebec, CanadaPartially operational
Evidence
Planned critical IT
86 MW
Updated
Oct 28, 2026
Utility
Hydro-Québec

Vantage QC2 Quebec City Data Center Campus, also known as Vantage QC2 Quebec City, is a data center project in Quebec City, QC, CA associated with Vantage Data Centers. 30-acre campus; four data centers at full development; 925,000 square feet; 86 MW combined critical IT capacity. Hydro-Quebec-powered campus using extensive free-air economization, redundant mechanical systems and carrier-neutral connectivity.

Capacity

Reported capacity

Design

86 MW

Source

Reported capacity

Planned / design or future potential

86 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

86 MW is the operator-published facility or campus design boundary.

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)
Other participants (1)
Hydro-Québec

Utility provider

Sources by role
Utility provider (1)

Site & development

Location context

Actual

Vantage QC2 Quebec City | Quebec City | QC | CA

Source

Location context

Actual

Vantage QC2 Quebec City | Quebec City | QC | CA

Source

Location context

Actual

Quebec City, QC, CA

Source

Development detail

Actual

30-Acre campus; four data centers at full development; 925,000 square feet; 86 MW combined critical IT capacity.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Vantage Data Centers publishes 86 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

86 MW facility or campus design capacity.

Source

Project boundary

Actual

Vantage QC2 Quebec City

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

86 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Hydro-Quebec-powered campus using extensive free-air economization, redundant mechanical systems and carrier-neutral connectivity.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric grid

Energized

86 MW IT design

Direct Hydro-Québec substation access; IT design is distinct from actual demand.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
Vantage QC1 Montreal Data Center

Operating · Montreal, Quebec, Canada

Shared participant: Hydro-Québec · Shared participant: Vantage Data Centers · Same market: Quebec, Canada

Compare in a collection
Vantage QC4 Montreal Data Center Campus

Partially operational · Montreal, Quebec, Canada

Shared participant: Hydro-Québec · Shared participant: Vantage Data Centers · Same market: Quebec, Canada

Compare in a collection
Vantage QC6 Montreal Data Center

Operating · Montreal, Quebec, Canada

Shared participant: Hydro-Québec · Shared participant: Vantage Data Centers · Same market: Quebec, Canada

Compare in a collection