Vantage CA2 Santa Clara Data Center Campus, also known as Vantage CA2 Santa Clara, is a data center project in Santa Clara, CA, US associated with Vantage Data Centers. Nine-acre campus; three four-story data centers; more than 541,000 square feet; 75 MW critical IT load. Silicon Valley Power-served campus with three onsite transformers, reclaimed-water cooling and multiple diverse fiber paths.

Capacity

Reported capacity

Design

75 MW

Source

Reported capacity

Planned / design or future potential

75 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

75 MW is the operator-published facility or campus design boundary.

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)
Other participants (1)
Silicon Valley Power

Utility provider

Sources by role
Utility provider (1)

Site & development

Location context

Actual

Vantage CA2 Santa Clara | Santa Clara | CA | US

Source

Location context

Actual

Vantage CA2 Santa Clara | Santa Clara | CA | US

Source

Location context

Actual

Santa Clara, CA, US

Source

Development detail

Actual

Nine acre campus; three four story data centers; more than 541,000 square feet; 75 MW critical IT load.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Vantage Data Centers publishes 75 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

75 MW facility or campus design capacity.

Source

Project boundary

Actual

Vantage CA2 Santa Clara

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

75 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Silicon Valley Power-served campus with three onsite transformers, reclaimed-water cooling and multiple diverse fiber paths.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric grid

Energized

City record identifies the Silicon Valley Power substation serving CA21–CA23.

Other · Issued

McLaren / CA2 data center

City of Santa Clara

Dec 6, 2023

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Vantage CA1 Santa Clara Data Center Campus

Operating · Santa Clara, California, United States

Same locality: Santa Clara · Shared participant: Silicon Valley Power · Shared participant: Vantage Data Centers

Compare in a collection
Vantage CA3 Santa Clara Data Center

Under construction · Santa Clara, California, United States

Same locality: Santa Clara · Shared participant: Silicon Valley Power · Shared participant: Vantage Data Centers

Compare in a collection
CoreSite SV3 Santa Clara Data Center

Operating · Santa Clara, California, United States

Same locality: Santa Clara

Compare in a collection
CoreSite SV4 Santa Clara Data Center

Operating · Santa Clara, California, United States

Same locality: Santa Clara

Compare in a collection