Vantage LHR1 London Data Center Campus

North Acton, London, England, United KingdomPartially operational
Capacity
55 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage LHR1 London Data Center Campus

Vantage LHR1 London Data Center Campus, also known as Vantage LHR1 London I, is a data center project in North Acton, London, England, GB associated with Vantage Data Centers. Five-acre PowerGate campus; two multi-story data centers; 430,000 square feet; 55 MW critical IT capacity at full build. 110 MVA high-voltage substation, diverse National Grid feeds, closed-loop cooling and carrier-neutral connectivity.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load55 MWDesign · Vantage LHR1 London Data Center Campus
Design55 MWDesign · Vantage LHR1 London Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

55 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for Vantage LHR1 London I
Completed

Infrastructure

Electric GridEnergized

110 MVA high-voltage substation, diverse National Grid feeds, closed-loop cooling and carrier-neutral connectivity.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Vantage LHR1 London I | North Acton, London | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
55 MW
Design
Capacity Basis
Vantage Data Centers publishes 55 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage LHR1 London I | North Acton, London | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
55 MW
Design
Capacity Basis
55 MW facility or campus design capacity.
Actual
Project Boundary
Vantage LHR1 London I
Actual
Location Context
North Acton, London, England, GB
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
Five acre PowerGate campus; two multi story data centers; 430,000 square feet; 55 MW critical IT capacity at full build.
Actual
Capacity Basis
55 MW facility or campus design capacity.
Actual