Vantage MEL1 Melbourne Data Center Campus

Tullamarine, Melbourne, Victoria, AustraliaUnder construction
Evidence
Planned critical IT
64 MW
Updated
Oct 28, 2026
Utility
Jemena

Vantage MEL1 Melbourne Data Center Campus, also known as Vantage MEL1 Melbourne, is a data center project in Tullamarine, Melbourne, VIC, AU associated with Vantage Data Centers. Seven-acre campus; one AI-oriented data center; 270,000 square feet; 64 MW critical IT capacity. Jemena-served 66 kV onsite substation, hybrid chilled-water cooling and diverse carrier-neutral fiber paths. 64 MW is the construction-stage facility design confirmed by Vantage and its delivery contractor; no operating IT load is asserted.

Capacity

Reported capacity

Design

64 MW

Source

Reported capacity

Planned / design or future potential

64 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

64 MW is the construction-stage facility design confirmed by Vantage and its delivery contractor; no operating IT load is asserted.

Milestones (1)
Delivery contractor reports MEL1 fit-out in progress

Aug 29, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)
Other participants (2)
Jemena

Utility provider

Sources by role
Utility provider (1)
Prime Electrical & Data

Contractor

Sources by role
Contractor (1)

Site & development

Location context

Actual

Vantage MEL1 Melbourne | Tullamarine, Melbourne | VIC | AU

Source

Location context

Actual

Vantage MEL1 Melbourne | Tullamarine, Melbourne | VIC | AU

Source

Site area

Actual

7 acres

Source

Building count

Design

1 facility

Source

Building area

Design

25,000 square metres

Source

Onsite substation

Design

66 kV

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

Vantage Data Centers publishes 64 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

64 MW is the construction stage facility design confirmed by Vantage and its delivery contractor; no operating IT load is asserted.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

Jemena-served 66 kV onsite substation, hybrid chilled-water cooling and diverse carrier-neutral fiber paths.

Cooling system

Planned or represented

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric grid

Under construction

66 kV

On-campus substation and diverse feeds documented by the delivery contractor.

Public-source research. Plans may change. See Evidence for sources and qualifications.