Vantage MEL1 Melbourne Data Center Campus

Tullamarine, Melbourne, Victoria, AustraliaUnder construction
Capacity
64 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage MEL1 Melbourne Data Center Campus

Vantage MEL1 Melbourne Data Center Campus, also known as Vantage MEL1 Melbourne, is a data center project in Tullamarine, Melbourne, VIC, AU associated with Vantage Data Centers. Seven-acre campus; one AI-oriented data center; 270,000 square feet; 64 MW critical IT capacity. Jemena-served 66 kV onsite substation, hybrid chilled-water cooling and diverse carrier-neutral fiber paths. 64 MW is the construction-stage facility design confirmed by Vantage and its delivery contractor; no operating IT load is asserted.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load64 MWDesign · Vantage MEL1 Melbourne Data Center Campus
Future Potential64 MWDesign · Vantage MEL1 Melbourne Data Center Campus

Development

1 phases · 1 milestones
Development, permitting and phased deliveryUnder Construction

64 MW is the construction-stage facility design confirmed by Vantage and its delivery contractor; no operating IT load is asserted.

Aug 29, 2026
Delivery contractor reports MEL1 fit-out in progress
Completed

Infrastructure

Electric GridPlanned Or Represented

Jemena-served 66 kV onsite substation, hybrid chilled-water cooling and diverse carrier-neutral fiber paths.

Cooling SystemPlanned Or Represented

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridUnder Construction

66 kV

On-campus substation and diverse feeds documented by the delivery contractor.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Vantage MEL1 Melbourne | Tullamarine, Melbourne | VIC | AU
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
64 MW
Design
Capacity Basis
Vantage Data Centers publishes 64 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage MEL1 Melbourne | Tullamarine, Melbourne | VIC | AU
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
64 MW
Design
Capacity Basis
64 MW is the construction stage facility design confirmed by Vantage and its delivery contractor; no operating IT load is asserted.
Actual
Site Area
7 acres
Actual
Building Count
1 facility
Design
Building Area
25,000 square metres
Design
Onsite Substation
66 kV
Design