Data center siteSite record

Vantage KUL1 Cyberjaya Data Center Campus

Cyberjaya, Selangor, MalaysiaOperating / Stabilized
Capacity
31 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage KUL1 Cyberjaya Data Center Campus

Vantage KUL1 Cyberjaya Data Center Campus, also known as Vantage KUL1 Cyberjaya I, is a data center project in Cyberjaya, Selangor, MY associated with Vantage Data Centers. Six-acre campus; four multi-story data centers; 463,000 square feet at full development; 31 MW critical IT capacity. Carrier-neutral Cyberjaya campus with resilient electrical systems, low-water cooling and extensive connectivity.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load31 MWDesign · Vantage KUL1 Cyberjaya Data Center Campus
Design31 MWDesign · Vantage KUL1 Cyberjaya Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

31 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for Vantage KUL1 Cyberjaya I
Completed

Infrastructure

Electric GridEnergized

Carrier-neutral Cyberjaya campus with resilient electrical systems, low-water cooling and extensive connectivity.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridEnergized

31 MW IT design

TNB supplies multiple diverse feeds; adjacent KUL2 capacity is excluded.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Vantage KUL1 Cyberjaya I | Cyberjaya | Selangor | MY
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
31 MW
Design
Capacity Basis
Vantage Data Centers publishes 31 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage KUL1 Cyberjaya I | Cyberjaya | Selangor | MY
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
31 MW
Design
Capacity Basis
31 MW facility or campus design capacity.
Actual
Project Boundary
Vantage KUL1 Cyberjaya I
Actual
Location Context
Cyberjaya, Selangor, MY
Actual
Lifecycle Status
Operating
Actual
Development Detail
Six acre campus; four multi story data centers; 463,000 square feet at full development; 31 MW critical IT capacity.
Actual
Capacity Basis
31 MW facility or campus design capacity.
Actual