Vantage DUB1 Dublin Data Center Campus

Profile Park, Dublin, County Dublin, IrelandPartially operational
Evidence
Planned critical IT
52 MW
Updated
Oct 28, 2026

Vantage DUB1 Dublin Data Center Campus, also known as Vantage DUB1, is a data center project in Profile Park, Dublin, County Dublin, IE associated with Vantage Data Centers. 22-acre multi-phase campus; two planned two-story facilities in the first phases; 405,000 square feet; 52 MW critical IT load. Onsite 100 MVA multi-fuel generation plant, diverse feeds, low-water closed-loop cooling and carrier-neutral connectivity.

Capacity

Reported capacity

Design

52 MW

Source

Reported capacity

Planned / design or future potential

52 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

52 MW is the operator-published facility or campus design boundary.

Milestones (2)
Initial two-building DUB1 development received permission

Jul 19, 2022 · Recorded actual event

Completed · Permit approved

Source not linked
Final DUB-13 phase remained in environmental review record

Aug 1, 2025 · Recorded actual event

Completed · Permit filed

Source not linked

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Vantage DUB1 | Profile Park, Dublin | County Dublin | IE

Source

Location context

Actual

Vantage DUB1 | Profile Park, Dublin | County Dublin | IE

Source

Permitted initial buildings

Actual

2 buildings

Source

Permitted initial area

Design

40,589 square metres

Source

Proposed final phase area

Forecast

12,893 square metres

Source

Onsite generation

Design

100 MVA gross

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Vantage Data Centers publishes 52 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

52 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Onsite 100 MVA multi-fuel generation plant, diverse feeds, low-water closed-loop cooling and carrier-neutral connectivity.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Onsite generation

Permitted or installed

100 MVA gross

Multi-fuel onsite generation supports resilience; it is not operating IT load.

Other · Documented

Vantage DUB1 initial development

South Dublin County Council

Jul 19, 2022

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.