Vantage JNB1 Johannesburg Data Center Campus

Midrand, Johannesburg, Gauteng, South AfricaPartially operational
Evidence
Planned critical IT
120 MW
Updated
Oct 28, 2026
Utility
Eskom

Vantage JNB1 Johannesburg Data Center Campus, also known as Vantage JNB1 Johannesburg I, is a data center project in Midrand, Johannesburg, Gauteng, ZA associated with Vantage Data Centers. 30-acre Waterfall City campus; three data centers at full build; 650,000 square feet; 120 MW critical IT capacity. High-density campus with resilient power, closed-loop cooling and carrier-neutral connectivity near major cloud on-ramps. The current JNB1 project page markets 120 MW at full build, while Vantage’s 2022 opening release and current EMEA rollup imply an 80 MW JNB1 plan alongside 20 MW JNB2. the conflicting operator figures remain unresolved. Current operator evidence conflicts materially and does not establish a single project-scoped capacity figure.

Capacity

Reported capacity

Design

120 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

JNB1 phased campusPartially operational

3 buildings

16 MW operating first building; 80 MW earlier full-build plan; 120 MW current project-page plan. Headline withheld.

Milestones (1)
First 16 MW JNB1 facility opened

Jul 25, 2022 · Recorded actual event

Completed · Commercial operation

Source not linked

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)
Other participants (1)
Eskom

Utility provider

Sources by role
Utility provider (1)

Capital & incentives

Capital claims and financing records may overlap. Their amounts are not added together.

Capital claims

Announced investment

Transaction scope

More than $1 billion

Source

Financing records

Investment commitment

$1bn

Jul 25, 2022

Operator described investment as more than $1 billion for the campus; recorded conservatively as the disclosed floor.

Parties & sources

Vantage Data Centers (Borrower)

Sources (1)

Site & development

Location context

Actual

Vantage JNB1 Johannesburg I | Midrand, Johannesburg | Gauteng | ZA

Source

Location context

Actual

Vantage JNB1 Johannesburg I | Midrand, Johannesburg | Gauteng | ZA

Source

Site area

Actual

30 acres

Source

Building count

Design

3 data centers

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Vantage Data Centers publishes 120 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

High-density campus with resilient power, closed-loop cooling and carrier-neutral connectivity near major cloud on-ramps.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
Vantage JNB2 Johannesburg Data Center

Partially operational · Isando, Ekurhuleni, Gauteng, South Africa

Shared participant: Vantage Data Centers · Same market: Gauteng, South Africa

Compare in a collection