Vantage KUL2 Cyberjaya

Cyberjaya, Selangor, SGR, MalaysiaUnder construction
Evidence
Planned critical IT
436 MW
Updated
Oct 28, 2026
Utility
Tenaga Nasional Berhad

Vantage's second Cyberjaya campus is under construction under a materially expanded current master plan. Vantage KUL2 Cyberjaya is located in Cyberjaya, Selangor, SGR, MY and is a data center campus in construction status.

Capacity

Current design capacity

Planned / design or future potential

436 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

2023-2024 announced master planUnder construction

Historical 256 MW / 35-acre envelope; building count conflicts between government and industry sources.

Current expanded master planUnder construction

6 buildings

Current 436 MW / 52-acre / six-data center design envelope; commissioned tranche undisclosed.

Milestones (4)
Vantage announces the original KUL2 master plan

May 16, 2023 · Recorded actual event

Completed · Announced

Source not linked
KUL2 construction begins

Aug 6, 2024 · Recorded actual event

Completed · Construction started

Source not linked
Industry update still describes KUL2 as in development

Dec 4, 2025 · Recorded actual event

Completed · Status changed

Source not linked
Original first-facility target passes without a located RFS notice

Q4 2025 · Event timing type not established

Status not stated · Event type not stated

Source not linked

Participants

Vantage Data Centers

Developer · Operator

Sources by role
Developer (1)
Developer / Operator (1)
Other participants (1)
Tenaga Nasional Berhad

Utility provider

Sources by role
Utility provider (1)

Capital & incentives

Capital claims

Announced investment

Reported rounded

$3 billion

Source

Announced investment

Reported rounded

13.32 MYR billion

Source

Site & development

Current site area

Reported rounded

52 acres

Source

Current floor area

Reported rounded

4.8 million square feet

Source

Current floor area

Reported rounded

445,000 square meters

Source

Construction start

Actual

2024-08-06

Source

Additional project facts

Current status

Actual

Construction

Source

Current planned data center count

Reported rounded

6 data centers

Source

Dedicated substation

Actual

True

Source

Adjacent campus

Actual

KUL1

Source

Operating capacity verified

Actual

False

Source

First facility rfs verified

Actual

False

Source

Design scope changed

Actual

True

Source

Country

Actual

Malaysia

Source

Locality

Actual

Cyberjaya, Selangor

Source

Developer operator

Actual

Vantage Data Centers

Source

Infrastructure & permits

Technical details (1)
Electric grid

Planned or represented

500 MVA reported

Dedicated substation is first-party; 500 MVA N+1 rating is secondary and must not be treated as IT load.

Public-source research. Plans may change. See Evidence for sources and qualifications.