Data center siteSite record

Vantage KUL2 Cyberjaya

Cyberjaya, Selangor, SGR, MalaysiaUnder construction
Capacity
436 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About Vantage KUL2 Cyberjaya

Vantage's second Cyberjaya campus is under construction under a materially expanded current master plan. Vantage KUL2 Cyberjaya is located in Cyberjaya, Selangor, SGR, MY and is a data center campus in construction status. Participants include Vantage Data Centers as developer, Vantage Data Centers as operator, Tenaga Nasional Berhad as utility. Development comprises 2023-2024 announced master plan (construction), Current expanded master plan (construction). Key milestones include Industry update still describes KUL2 as in development (2025-12-04) and Original first-facility target passes without a located RFS notice (2025-12-31). dedicated substation — 500 MVA reported: Dedicated substation is first-party; 500 MVA N+1 rating is secondary and must not be treated as IT load.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design436 MWReported Rounded · Vantage KUL2 Cyberjaya

Development

2 phases · 4 milestones
2023-2024 announced master planUnder Construction

Historical 256 MW / 35-acre envelope; building count conflicts between government and industry sources.

Current expanded master planUnder Construction

Current 436 MW / 52-acre / six-data center design envelope; commissioned tranche undisclosed.

6 buildings

May 16, 2023
Vantage announces the original KUL2 master plan
Completed
Aug 6, 2024
KUL2 construction begins
Completed
Dec 4, 2025
Industry update still describes KUL2 as in development
Completed
Dec 31, 2025
Original first-facility target passes without a located RFS notice
Quarter

Infrastructure

Electric GridPlanned Or Represented

500 MVA reported

Dedicated substation is first-party; 500 MVA N+1 rating is secondary and must not be treated as IT load.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

17 facts
Current Status
Construction
Actual
Current Design Capacity
436 MW critical IT load
Reported Rounded
Current Site Area
52 acres
Reported Rounded
Current Floor Area
4.8 million square feet
Reported Rounded
Current Floor Area
445,000 square meters
Reported Rounded
Current Planned Data Center Count
6 data centers
Reported Rounded
Announced Investment
$3 billion
Reported Rounded
Announced Investment
13.32 MYR billion
Reported Rounded
Construction Start
2024-08-06
Actual
Dedicated Substation
True
Actual
Adjacent Campus
KUL1
Actual
Operating Capacity Verified
False
Actual
First Facility Rfs Verified
False
Actual
Design Scope Changed
True
Actual
Country
Malaysia
Actual
Locality
Cyberjaya, Selangor
Actual
Developer Operator
Vantage Data Centers
Actual