Skip to content

ValorC3 St. George Data Center

St. George, Utah, United StatesOperating
Evidence
Planned / design
4 MW
Updated
Oct 28, 2026

ValorC3 St. George Data Center is an operating ValorC3 data center facility in St. George, Utah. ValorC3's purpose-built St. George facility, formerly Tonaquint; facility power remains distinct from municipal substation MW. The retrofit records facility power capacity: 4 MW; building area: 30,000 sq ft. Utility service, UPS, standby generation, cooling, facility power and IT load are kept in their source-defined scopes rather than collapsed into one capacity number. Where reliable public evidence for ownership, project financing, permitting, tenants or water arrangements was not established, Cartis records the research gap explicitly instead of inferring a fact.

Capacity

Facility power capacity

Planned / design or future potential

4 MW

Source

Primary substation capacity

Actual

23 MW

Source

Backup substation capacity

Actual

15 MW

Source

Generator unit capacity

Actual

2 MW

Generation capacity; not IT capacity

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

St. George facilityOperational

Operating data center facility.

Milestones (3)
ValorC3 history traces the St. George/Tonaquint facility to 2008.

2008 · Recorded actual event

facility established

Completed · Commercial operation

Sources (1)
Tonaquint rebranded as ValorC3 Data Centers

Jan 20, 2025 · Recorded actual event

Completed · Status changed

Source not linked
Tonaquint launched the ValorC3 brand; physical-facility continuity is preserved.

Jan 20, 2025 · Recorded actual event

operator rebrand

Completed · Status changed

Sources (1)

Participants

ValorC3

Operator

Sources by role
Operator (1)
Operator (1)

Site & development

Building area

Actual

30,000 sq. ft.

Source

Raised floor area

Actual

17,200 sq. ft.

Source

Additional project facts

Facility identity

Actual

ValorC3 St. George Data Center

Source

UPS unit count

Actual

8 units

Source

UPS unit capacity

Actual

750 kVA

Source

Crac unit count

Actual

40 units

Source

Crac unit capacity

Actual

30 tons

Source

Carrier count floor

Actual

16 carriers

Source

Infrastructure & permits

Technical details (5)
Electric grid

Operational

4 MW

Facility power capacity. Supporting substations separately disclosed at 23 MW primary and 15 MW backup.

Onsite generation

Operational

2 MW

N+1 generator unit rating; generation is not IT load.

Fuel storage

Operational

6,000 gallons

Standby-generation fuel storage.

Cooling system

Operational

40 redundant CRAC units rated 30 tons each; no source-stated aggregate is inferred.

Fiber

Operational

16 carriers

16+ carriers; value is a lower bound.