Vantage OH1 New Albany Data Center Campus

New Albany, Ohio, United StatesPartially operational
Capacity
192 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage OH1 New Albany Data Center Campus

Vantage OH1 New Albany Data Center Campus, also known as Vantage OH1 New Albany, is a data center project in New Albany, OH, US associated with Vantage Data Centers. 70-acre campus; three 64 MW data centers; 1.5 million square feet; 192 MW critical IT load at full build. AEP Ohio-served campus with diverse utility feeds, closed-loop chilled-water cooling and carrier-neutral fiber access.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load192 MWDesign · Vantage OH1 New Albany Data Center Campus
Design192 MWDesign · Vantage OH1 New Albany Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

192 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for Vantage OH1 New Albany
Completed

Infrastructure

Electric GridEnergized

AEP Ohio-served campus with diverse utility feeds, closed-loop chilled-water cooling and carrier-neutral fiber access.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Vantage OH1 New Albany | New Albany | OH | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
192 MW
Design
Capacity Basis
Vantage Data Centers publishes 192 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage OH1 New Albany | New Albany | OH | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
192 MW
Design
Capacity Basis
192 MW facility or campus design capacity.
Actual
Project Boundary
Vantage OH1 New Albany
Actual
Location Context
New Albany, OH, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
70-Acre campus; three 64 MW data centers; 1.5 million square feet; 192 MW critical IT load at full build.
Actual
Capacity Basis
192 MW facility or campus design capacity.
Actual