Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

1,043 results · Page 19 of 21
Capacity stages and scopes differ; do not add figures together. How to compare

724 of 1043 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

STT Jakarta 5 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
40 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 6 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
40 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 7 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
60 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 8 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
60 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 9 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
60 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Johor Campus / STT Johor 1Site · Connected record
Nusa Cemerlang Industrial Park, Iskandar Puteri, Johor, JHR, Malaysia
Ditrolic EnergyJohor State Government
Construction
Not establishedIn published records
STT GDC Malaysia
Oct 28, 2026
STT Navi Mumbai 1 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Operating
28 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Navi Mumbai 2 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Construction
49 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Navi Mumbai 3 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Construction
42 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Navi Mumbai 4 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Construction
36 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Noida 2 Data CenterSite · Connected record
Noida, Uttar Pradesh, India
STT GDC India
Construction
22 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Noida 3 Data CenterSite · Connected record
Noida, Uttar Pradesh, India
STT GDC India
Construction
28 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Palava 1 Data CenterSite · Connected record
Palava, Maharashtra, India
STT GDC India
Construction
50 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Palava 4 Data CenterSite · Connected record
Palava, Maharashtra, India
STT GDC India
Construction
60.5 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Palava 5 Data CenterSite · Connected record
Palava, Maharashtra, India
STT GDC India
Construction
60.5 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Pune 2 Data CenterSite · Connected record
Pune, Maharashtra, India
STT GDC India
Operating
15 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Pune 4 Data CenterSite · Connected record
Pune, Maharashtra, India
STT GDC India
Operating
18 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Pune 5 Data CenterSite · Connected record
Pune, Maharashtra, India
STT GDC India
Operating
24 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Singapore 1 Data CenterSite · Connected record
Singapore
ST Telemedia Global Data Centres
Operating
13 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Singapore 2 Data CenterSite · Connected record
Singapore
ST Telemedia Global Data Centres
Operating
12 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Singapore 6 Data CenterSite · Connected record
Singapore
ST Telemedia Global Data Centres
Operating
40 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
Summit Elk Grove Village Data CenterSite · Connected record
Elk Grove Village, Illinois, United States
Summit
Operating
36.4 MW
Basis: Critical ITPlanned critical IT
Summit
Oct 28, 2026
Surry Green Energy CenterSite · Connected record
Surry, Virginia, United States
Green Energy Partners
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Green Energy Partners
Oct 28, 2026
Switch Atlanta Keep CampusSite · Connected record
Atlanta, Georgia, United States
Switch
Partially operational
150 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Austin Rock CampusSite · Connected record
Round Rock, Texas, United States
Switch
Partially operational
285 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Grand Rapids Pyramid CampusSite · Connected record
Grand Rapids, Michigan, United States
Switch
Partially operational
237 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Las Vegas Core CampusSite · Connected record
Las Vegas, Nevada, United States
Switch
Partially operational
495 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Tahoe Reno Citadel CampusSite · Connected record
Tahoe Reno Industrial Center, Nevada, United States
Capital DynamicsDigitalBridge
Operating
850 MW
Basis: Basis not specifiedPlanned / design
Capital Dynamics
Oct 28, 2026
Synapse Olds Data CentreSite · Connected record
Olds, Alberta, Canada
Alberta Electric System OperatorSynapse Real Estate Corp.
Proposed
Not establishedIn published records
Synapse Real Estate Corp.
Oct 28, 2026
T1 Giga Arctic Data Center ConversionSite · Connected record
Mo i Rana, Nordland, Norway
T1 Energy
Permitted
50 MW
Basis: Basis not specifiedPlanned / design
T1 Energy
Oct 28, 2026
T5 Chicago IV Data CenterSite · Connected record
Grayslake, Illinois, United States
T5 Data Centers
Proposed
Not establishedIn published records
T5 Data Centers
Oct 28, 2026
TAC Data Centers - Wythe CountySite · Connected record
Fort Chiswell, Virginia, United States
TAC Data Centers
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
TAC Data Centers
Oct 28, 2026
Talen Energy Montour Data CenterSite · Connected record
Anthony Township, Pennsylvania, United States
Talen Energy
Proposed
Not establishedIn published records
Talen Energy
Oct 28, 2026
TECfusions Keystone Connect AI CampusSite · Connected record
Upper Burrell Township, Pennsylvania, United States
TECfusions
Proposed
3,000 MW
Basis: Basis not specifiedPlanned / design
TECfusions
Oct 28, 2026
Telia Strängnäs Sovereign AI Service DeploymentSite · Connected record
Strängnäs, Södermanland, Sweden
Telia CompanyTelia Cygate
Preconstruction
Not establishedIn published records
Telia Cygate
Oct 28, 2026
TELUS Rimouski Sovereign AI FactorySite · Connected record
Rimouski, Quebec, Canada
AccentureHewlett Packard Enterprise
Operating
Not establishedIn published records
TELUS
Oct 28, 2026
Teraco CT1 RondeboschSite · Connected record
Rondebosch, Cape Town, WC, South Africa
Digital Realty TrustTeraco Data Environments
Operating
3 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Teraco CT2 BrackenfellSite · Connected record
Brackenfell, Cape Town, WC, South Africa
Digital Realty TrustTeraco Data Environments
Operating
50 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Teraco Free State Solar PV PlantSite · Connected record
Free State province, FS, South Africa
EskomJUWI Renewable Energies South Africa
Construction
Not establishedIn published records
Subsolar
Oct 28, 2026
TeraWulf Chesapeake Data & Energy CampusSite · Connected record
Morgantown, Maryland, United States
TeraWulf
Permitted
800 MW
Basis: Critical ITPlanned critical IT
TeraWulf
Oct 28, 2026
TeraWulf Justified Data Hawesville CampusSite · Connected record
Hawesville, Kentucky, United States
AnthropicTeraWulf
Construction
401 MW
Basis: Basis not specifiedContracted
TeraWulf
Oct 28, 2026
TeraWulf Lake Hawkeye Data CampusSite · Connected record
Lansing, New York, United States
TeraWulf
Permitted
320 MW
Basis: Critical ITPlanned critical IT
TeraWulf
Oct 28, 2026
TeraWulf Muskie Data CampusSite · Connected record
Grayson, Kentucky, United States
Kentucky PowerTeraWulf
Preconstruction
800 MW
Basis: Critical ITPlanned critical IT
TeraWulf
Oct 28, 2026
Terranova Campinas CampusSite · Connected record
Campinas, near Unicamp, São Paulo, Brazil
ActisGeneral Atlantic
Preconstruction
Not establishedIn published records
General Atlantic
Oct 28, 2026
Terranova Querétaro CampusSite · Connected record
Querétaro area, QUE, Mexico
ActisGeneral Atlantic
Partially operational
20 MW
Basis: Critical ITPlanned critical IT
General Atlantic
Oct 28, 2026
TierPoint Boston–Marlborough Data CenterSite · Connected record
Marlborough, Massachusetts, United States
TierPoint
Operating
Not establishedIn published records
TierPoint
Oct 28, 2026
TierPoint Seattle Data CenterSite · Connected record
Seattle, Washington, United States
TierPoint
Operating
Not establishedIn published records
TierPoint
Oct 28, 2026
Tract Buckeye Technology ParkSite · Connected record
Buckeye, Arizona, United States
Tract
Preconstruction
1,800 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Des MoinesSite · Connected record
Altoona, Iowa, United States
Tract
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Illinois (Morris)Site · Connected record
Morris, Illinois, United States
Tract
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.