Data center siteSite record

TeraWulf Lake Hawkeye Data Campus

Lansing, New York, United StatesEntitled / Permitted
Capacity
320 MW
Planned critical IT
Lead participant
TeraWulf
Developer
Last updated
Aug 27, 2026
Most recent public record update

About TeraWulf Lake Hawkeye Data Campus

TeraWulf is permitting Lake Hawkeye as a redevelopment of a former industrial site in Lansing, New York. Its current design supports approximately 320 MW of critical IT load. TeraWulf is associated with the development in Lansing, Tompkins County, NY, US. The disclosed development scope includes 320 MW planned critical IT; 183-acre leased site; operations not contemplated before about 2029. Power and physical infrastructure include existing electrical infrastructure and triple-redundant 115 kV transmission. TeraWulf identifies approximately 320 MW of planned critical IT capacity.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load320 MWDesign · TeraWulf Lake Hawkeye Data Campus
It Load320 MWDesign · TeraWulf Lake Hawkeye Data Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for TeraWulf Lake Hawkeye Data Campus; capacity class is it load.

Aug 5, 2026
Lake Hawkeye Lansing development disclosed
Completed
Permitting and site development
Forecast

Infrastructure

Electric GridPlanned Or Represented

320 MW

TeraWulf identifies approximately 320 MW of planned critical IT capacity.

Site FacilityPlanned Or Represented

Existing electrical infrastructure and triple-redundant 115 kV transmission.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Lake Hawkeye | Lansing | New York
Actual
Lifecycle Status
Permitted
Actual
Reported Capacity
320 MW
Design
Capacity Basis
TeraWulf identifies approximately 320 MW of planned critical IT capacity.
Actual
Location Context
Lake Hawkeye | Lansing | New York
Actual
Lifecycle Status
Permitted
Actual
Reported Capacity
320 MW
Design
Capacity Basis
TeraWulf identifies approximately 320 MW of planned critical IT capacity.
Actual
Development Scale
320 MW planned critical IT
Actual
Development Milestone
183-Acre leased site
Actual
Power Arrangement
Operations not contemplated before about 2029.
Actual
Site Configuration
Lake Hawkeye | Lansing | New York
Actual