TeraWulf Lake Hawkeye Data Campus
- Planned critical IT
- 320 MW
- Updated
- Oct 28, 2026
TeraWulf is permitting Lake Hawkeye as a redevelopment of a former industrial site in Lansing, New York. Its current design supports approximately 320 MW of critical IT load. TeraWulf is associated with the development in Lansing, Tompkins County, NY, US. The disclosed development scope includes 320 MW planned critical IT; 183-acre leased site; operations not contemplated before about 2029. Power and physical infrastructure include existing electrical infrastructure and triple-redundant 115 kV transmission. TeraWulf identifies approximately 320 MW of planned critical IT capacity.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Project-wide phase for TeraWulf Lake Hawkeye Data Campus; capacity class is it load.
Milestones (2)
Aug 5, 2026 · Recorded actual event
Completed · Announced
Source not linkedDate not disclosed · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- TeraWulf reports second-quarter 2026 results · Aug 5, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
320 MW
TeraWulf identifies approximately 320 MW of planned critical IT capacity.
Planned or represented
Existing electrical infrastructure and triple-redundant 115 kV transmission.
Project map