Skip to content

TeraWulf Lake Hawkeye Data Campus

Lansing, New York, United StatesPermitted
Evidence
Planned critical IT
320 MW
Updated
Oct 28, 2026

TeraWulf is permitting Lake Hawkeye as a redevelopment of a former industrial site in Lansing, New York. Its current design supports approximately 320 MW of critical IT load. TeraWulf is associated with the development in Lansing, Tompkins County, NY, US. The disclosed development scope includes 320 MW planned critical IT; 183-acre leased site; operations not contemplated before about 2029. Power and physical infrastructure include existing electrical infrastructure and triple-redundant 115 kV transmission. TeraWulf identifies approximately 320 MW of planned critical IT capacity.

Capacity

Reported capacity

Design

320 MW

Source

Reported capacity

Design

320 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for TeraWulf Lake Hawkeye Data Campus; capacity class is it load.

Milestones (2)
Lake Hawkeye Lansing development disclosed

Aug 5, 2026 · Recorded actual event

Completed · Announced

Source not linked
Permitting and site development

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

TeraWulf

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Lake Hawkeye | Lansing | New York

Source

Location context

Actual

Lake Hawkeye | Lansing | New York

Source

Development scale

Actual

320 MW planned critical IT

Source

Development milestone

Actual

183-Acre leased site

Source

Site configuration

Actual

Lake Hawkeye | Lansing | New York

Source

Technical specifications

Power arrangement

Actual

Operations not contemplated before about 2029.

Source

Additional project facts

Lifecycle status

Actual

Permitted

Source

Capacity basis

Actual

TeraWulf identifies approximately 320 MW of planned critical IT capacity.

Source

Lifecycle status

Actual

Permitted

Source

Capacity basis

Actual

TeraWulf identifies approximately 320 MW of planned critical IT capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

320 MW

TeraWulf identifies approximately 320 MW of planned critical IT capacity.

Site facility

Planned or represented

Existing electrical infrastructure and triple-redundant 115 kV transmission.

Public-source research. Plans may change. See Evidence for sources and qualifications.