TeraWulf Lake Hawkeye Data Campus
About TeraWulf Lake Hawkeye Data Campus
TeraWulf is permitting Lake Hawkeye as a redevelopment of a former industrial site in Lansing, New York. Its current design supports approximately 320 MW of critical IT load. TeraWulf is associated with the development in Lansing, Tompkins County, NY, US. The disclosed development scope includes 320 MW planned critical IT; 183-acre leased site; operations not contemplated before about 2029. Power and physical infrastructure include existing electrical infrastructure and triple-redundant 115 kV transmission. TeraWulf identifies approximately 320 MW of planned critical IT capacity.
Capacity
Planned critical ITDevelopment
1 phases · 2 milestonesProject-wide phase for TeraWulf Lake Hawkeye Data Campus; capacity class is it load.
Infrastructure
320 MW
TeraWulf identifies approximately 320 MW of planned critical IT capacity.
Existing electrical infrastructure and triple-redundant 115 kV transmission.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.