About Tract Des Moines

Tract acquired a fully entitled 453-acre site in Altoona, Iowa for a technology park capable of supporting more than 1 GW over time. The site sits on existing 345 kV transmission, includes 80 acres reserved for the city’s growth plan, and has completed annexation, rezoning and a development agreement.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential1,000 MWDesign · Tract Des Moines

Development

1 phases · 1 milestones
Fully entitled; powered-land developmentAnnounced Or Preconstruction

Tract acquired a fully entitled 453-acre site in Altoona, Iowa for a technology park capable of supporting more than 1 GW over time. The site sits on existing 345 kV transmission, includes 80 acres reserved for the city’s growth plan, and has completed annexation, rezoning and a development agreement.

Sep 9, 2025
Tract announced acquisition of the fully entitled site
Completed

Infrastructure

Electric GridPlanned Or Represented

1,000 MW

Site positioned on existing 345 kV transmission.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

7 facts
Location Context
Tract Des Moines | Altoona | Iowa | US
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
1,000 MW
Design
Capacity Basis
1,000 MW future full build site capacity; not measured operating IT load.
Actual
Site Area
453 acres
Actual
Reserved City Area
80 acres
Actual
Entitlement Status
Fully entitled