About TELUS Rimouski Sovereign AI Factory
TELUS opened its Rimouski Sovereign AI Factory in September 2025 and reported it sold out by May 2026. Its HPE/NVIDIA system achieved 22.74 petaFLOPS on TOP500 testing.
Related projects
Projects sharing a market, utility, or organization.
Capacity
No additional capacity claims are published.
Development
2 phases · 6 milestonesAI system inside the existing Rimouski data center; facility MW not disclosed.
1 building
Do not import future British Columbia capacity into Rimouski.
Infrastructure
22.74 petaFLOPS
hpl compute performance — 22.74 petaFLOPS; operating.
3.2 Tbit per second
infiniband fabric — 3.2 Tbit_per_second; operating.
fiber network; operating.
99 percent
renewable energy share — 99 percent; operating.
98 percent of year
free cooling — 98 percent_of_year; operating.