About TELUS Rimouski Sovereign AI Factory

TELUS opened its Rimouski Sovereign AI Factory in September 2025 and reported it sold out by May 2026. Its HPE/NVIDIA system achieved 22.74 petaFLOPS on TOP500 testing.

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

2 phases · 6 milestones
Rimouski AI compute deployment and openingOperational

AI system inside the existing Rimouski data center; facility MW not disclosed.

1 building

Sold-out service and inventory expansionOperational

Do not import future British Columbia capacity into Rimouski.

Mar 18, 2025
TELUS announces Rimouski AI deployment
Completed
Aug 31, 2025
Original Rimouski opening target
Cancelled
Sep 24, 2025
Rimouski Sovereign AI Factory opens
Completed
Nov 17, 2025
System becomes Canada's highest-ranked supercomputer
Completed
May 11, 2026
TELUS confirms Rimouski sold out
Completed
Jun 23, 2026
June 2026 TOP500 rank update
Completed

Infrastructure

Compute And Platform SystemOperational

22.74 petaFLOPS

hpl compute performance — 22.74 petaFLOPS; operating.

Compute And Platform SystemOperational

3.2 Tbit per second

infiniband fabric — 3.2 Tbit_per_second; operating.

FiberOperational

fiber network; operating.

Renewable Energy SupplyOperational

99 percent

renewable energy share — 99 percent; operating.

Cooling SystemOperational

98 percent of year

free cooling — 98 percent_of_year; operating.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
4

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1Site systems: 2

Facts & sources

Published claims and their source links.

16 facts
Project Status
Operating
Actual
Opening Date
2025-09-24
Actual
Commercial Availability
Sold out
Transaction Scope
Hpl Rmax
22.74 petaFLOPS
Actual
Hpl Rpeak
27.44 petaFLOPS
Actual
Top500 Rank
78 rank
Actual
Top500 Rank
95 rank
Actual
System Cpu Gpu Cores
70,560 core
Actual
Gpu Model
NVIDIA H200 SXM5
Actual
Gpu Memory Per Device
141 GB HBM3e
Actual
Gpu Memory Bandwidth
4.8 TB per second
Actual
Dedicated Infiniband Fabric
3.2 Tbit per second
Actual
Renewable Energy Share
99 percent
Actual
Free Cooling Availability
98 percent of year
Design
Facility Certification
Tier III
Actual
Sustainability Certification
LEED Gold
Actual