Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 5 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Campus AI FranceSite · Connected record
Paris region, France
BpifranceMGX
Preconstruction
1,400 MW
Basis: Critical ITPlanned critical IT
Mistral AI
Oct 28, 2026
CDC Canberra Data Centre ProgramProgram · Connected record
Canberra, Australian Capital Territory, Australia
CDC Data Centres
Status under review
Not establishedIn published records
CDC Data Centres
Oct 28, 2026
CDC Hume Campus OneSite · Connected record
Hume, Australian Capital Territory, Australia
CDC Data Centres
Operating
Not establishedIn published records
CDC Data Centres
Oct 28, 2026
CDC Hume Campus TwoSite · Connected record
Hume, Australian Capital Territory, Australia
CDC Data CentresHindmarsh
Operating
Not establishedIn published records
CDC Data Centres
Oct 28, 2026
CDC Marsden Park CampusSite · Connected record
Marsden Park, Sydney, New South Wales, Australia
Blacktown City CouncilCDC Data Centres
Construction
1,000 MW
Basis: Basis not specifiedPlanned / design
CDC Data Centres
Oct 28, 2026
Cedar Rapids Data CenterSite · Connected record
Cedar Rapids, Iowa, United States
Google
Preconstruction
600 MW
Basis: Basis not specifiedPlanned / design
Google
Oct 28, 2026
center3 Saudi Data Center PortfolioProgram · Connected record
Saudi Arabia; national portfolio, Saudi Arabia
center3Huawei
Status under review
Not establishedIn published records
stc Group
Oct 28, 2026
Centersquare BOS1 Waltham Data CenterSite · Connected record
Waltham, Massachusetts, United States
Centersquare
Operating
Not establishedIn published records
Centersquare
Oct 28, 2026
Centersquare BOS4 Watertown Data CenterSite · Connected record
Watertown, Massachusetts, United States
Centersquare
Operating
7.2 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare CMH1 Lewis Center Data CenterSite · Connected record
Lewis Center, Ohio, United States
Centersquare
Operating
1.8 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare DEN1 Highlands Ranch Data CenterSite · Connected record
Highlands Ranch, Colorado, United States
Centersquare
Operating
9.2 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare EWR2 Weehawken Data CenterSite · Connected record
Weehawken, New Jersey, United States
Centersquare
Operating
Not establishedIn published records
Centersquare
Oct 28, 2026
Centersquare EWR5 Secaucus Data CenterSite · Connected record
Secaucus, New Jersey, United States
Centersquare
Operating
8.4 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare LAX3 Irvine Data CenterSite · Connected record
Irvine, California, United States
Centersquare
Operating
9.2 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare LAX4 Hawthorne Data CenterSite · Connected record
Hawthorne, California, United States
Centersquare
Operating
2.7 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare MSP1 Shakopee Data CenterSite · Connected record
Shakopee, Minnesota, United States
Centersquare
Operating
8.4 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare ORD2 Elk Grove Village Data CenterSite · Connected record
Elk Grove Village, Illinois, United States
Centersquare
Operating
14.4 MW
Basis: Basis not specifiedPlanned / design
Centersquare
Oct 28, 2026
Centersquare ORD4 Lisle Data CenterSite · Connected record
Lisle, Illinois, United States
Centersquare
Operating
Not establishedIn published records
Centersquare
Oct 28, 2026
Christopher M. Crane Clean Energy Center RestartEnergy asset · Connected record
Londonderry Township / Middletown, Pennsylvania, United States
Constellation Energy Generation, LLCFederal Energy Regulatory Commission
Construction
835 MW
Basis: Basis not specifiedPlanned / design
Constellation Energy Generation, LLC
Oct 28, 2026
Cipher Barber Lake AI Data Center CampusSite · Connected record
Colorado City, Texas, United States
Cipher DigitalFluidstack
Partially operational
168 MW
Basis: Basis not specifiedContracted
Cipher Digital
Oct 28, 2026
Cipher Black Pearl AI Data Center CampusSite · Connected record
Wink, Texas, United States
Amazon Web ServicesCipher Digital
Partially operational
300 MW
Basis: Basis not specifiedContracted
Cipher Digital
Oct 28, 2026
Cipher Colchis AI Data Center CampusSite · Connected record
Texas, United States
AEPCipher Digital
Preconstruction
1,000 MW
Basis: Basis not specifiedPlanned / design
Cipher Digital
Oct 28, 2026
Cipher McLennan AI Data Center CampusSite · Connected record
Texas, United States
Cipher Digital
Preconstruction
500 MW
Basis: Basis not specifiedPlanned / design
Cipher Digital
Oct 28, 2026
Cipher Mikeska AI Data Center CampusSite · Connected record
Texas, United States
Cipher Digital
Preconstruction
500 MW
Basis: Basis not specifiedPlanned / design
Cipher Digital
Oct 28, 2026
Cipher Milsing AI Data Center CampusSite · Connected record
Texas, United States
Cipher Digital
Proposed
Not establishedIn published records
Cipher Digital
Oct 28, 2026
Cipher Reveille AI Data Center CampusSite · Connected record
Texas, United States
Cipher Digital
Preconstruction
70 MW
Basis: Utility / grid serviceUtility capacity
Cipher Digital
Oct 28, 2026
Cipher Stingray AI Data Center CampusSite · Connected record
Texas, United States
Cipher Digital
Construction
100 MW
Basis: Basis not specifiedContracted
Cipher Digital
Oct 28, 2026
Cipher Ulysses AI Data Center CampusSite · Connected record
Ohio, United States
Cipher Digital
Preconstruction
200 MW
Basis: Utility / grid serviceUtility capacity
Cipher Digital
Oct 28, 2026
CleanArc VA1 CampusSite · Connected record
Ruther Glen, Virginia, United States
CleanArc Data Centers
Preconstruction
900 MW
Basis: Basis not specifiedPlanned / design
CleanArc Data Centers
Oct 28, 2026
CleanCore West Texas AI Data Center CampusSite · Connected record
Texas, United States
CleanCore Solutions
Preconstruction
200 MW
Basis: Basis not specifiedPlanned / design
CleanCore Solutions
Oct 28, 2026
CleanCore–Cerebras Minnesota AI Data CenterSite · Connected record
Minnesota, United States
Cerebras SystemsCleanCore Solutions
Preconstruction
40 MW
Basis: Basis not specifiedContracted
CleanCore Solutions
Oct 28, 2026
CleanSpark Sandersville AI Data Center CampusSite · Connected record
Sandersville, Georgia, United States
CleanSpark
Preconstruction
175 MW
Basis: Basis not specifiedContracted
CleanSpark
Oct 28, 2026
Clearstone Ebbsfleet Data Center CampusSite · Connected record
Ebbsfleet, England, United Kingdom
Clearstone
Proposed
300 MW
Basis: Basis not specifiedPlanned / design
Clearstone
Oct 28, 2026
CloudBurst Texas Flagship CampusSite · Connected record
Texas, United States
CloudBurst Data Centers
Preconstruction
1,200 MW
Basis: Critical ITPlanned critical IT
CloudBurst Data Centers
Oct 28, 2026
CloudHQ GIG CampusSite · Connected record
São João de Meriti, Rio de Janeiro, Brazil
CloudHQGovernment of the State of Rio de Janeiro
Preconstruction
36 MW
Basis: Critical ITPlanned critical IT
CloudHQ
Oct 28, 2026
CloudHQ QRO CampusSite · Connected record
Querétaro, Mexico
CloudHQ
Construction
360 MW
Basis: Critical ITPlanned critical IT
CloudHQ
Oct 28, 2026
Cloverleaf Infrastructure Troy CampusSite · Connected record
Troy, Illinois, United States
Cloverleaf Infrastructure
Proposed
500 MW
Basis: Basis not specifiedPlanned / design
Cloverleaf Infrastructure
Oct 28, 2026
College Station 600-MW Data Center ProposalSite · Connected record
College Station, Texas, United States
City of College StationPriority Power Management, LLC
Cancelled
600 MW
Basis: Basis not specifiedPlanned / design
Priority Power Management, LLC
Oct 28, 2026
Cologix COL1 Columbus Data CenterSite · Connected record
Columbus, Ohio, United States
Cologix, Inc.
Operating
Not establishedIn published records
Cologix, Inc.
Oct 28, 2026
Cologix COL2 Columbus Data CenterSite · Connected record
Columbus, Ohio, United States
Cologix, Inc.
Operating
Not establishedIn published records
Cologix, Inc.
Oct 28, 2026
Cologix COL3 Columbus Data CenterSite · Connected record
Columbus, Ohio, United States
AEP OhioCologix, Inc.
Operating
More than 18 MW
Basis: Basis not specifiedFacility design
Cologix, Inc.
Oct 28, 2026
Cologix COL4 Columbus Data CenterSite · Connected record
Columbus, Ohio, United States
Cologix, Inc.
Operating
40 MW
Basis: Basis not specifiedFacility design
Cologix, Inc.
Oct 28, 2026
Cologix JAX2 Jacksonville Data CenterSite · Connected record
Jacksonville, Florida, United States
Cologix, Inc.
Operating
Not establishedIn published records
Cologix, Inc.
Oct 28, 2026
Cologix Johnstown AI Data Center CampusSite · Connected record
Johnstown, Ohio, United States
Cologix, Inc.
Preconstruction
800 MW
Basis: Basis not specifiedPlanned / design
Cologix, Inc.
Oct 28, 2026
Cologix MIN2 Minneapolis Data CenterSite · Connected record
Minneapolis, Minnesota, United States
Cologix, Inc.
Operating
Not establishedIn published records
Cologix, Inc.
Oct 28, 2026
Cologix MIN3 Minneapolis Data CenterSite · Connected record
Minneapolis, Minnesota, United States
Cologix, Inc.
Operating
Not establishedIn published records
Cologix, Inc.
Oct 28, 2026
Colt Berlin 1 and 2 Data CentresSite · Connected record
Berlin, Germany
Colt Data Centre Services
Preconstruction
54 MW
Basis: Critical ITPlanned critical IT
Colt Data Centre Services
Oct 28, 2026
Colt Chennai Data CentreSite · Connected record
Ambattur, Tamil Nadu, India
Colt Data Centre Services
Preconstruction
Not establishedIn published records
Colt Data Centre Services
Oct 28, 2026
Colt Frankfurt 3 Data CentreSite · Connected record
Frankfurt, Hesse, Germany
Colt Data Centre Services
Construction
32.4 MW
Basis: Critical ITPlanned critical IT
Colt Data Centre Services
Oct 28, 2026
Colt Frankfurt 4 and 5 Data CentresSite · Connected record
Wiesbaden, Hesse, Germany
Colt Data Centre Services
Preconstruction
63 MW
Basis: Critical ITPlanned critical IT
Colt Data Centre Services
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.