Cipher Colchis AI Data Center Campus

Texas, United StatesPreconstruction
Capacity
1,000 MW
Planned / design
Lead participant
Cipher Digital
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Cipher Colchis AI Data Center Campus

Cipher is advancing Colchis as a gigawatt-scale Texas HPC campus. Land is secured and interconnection deposits are funded, but the 1 GW pipeline value remains subject to ERCOT review. Cipher Digital and AEP is publicly identified in the project record for Texas location undisclosed, TX, US. The disclosed development record includes 1,000 MW gross pipeline capacity; land secured; deposits funded; target energization in 2028 subject to ERCOT. Power and infrastructure include planned large-load grid interconnection and hyperscale data center campus. Cipher presents 1,000 MW of gross pipeline capacity subject to the ERCOT batch process.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential1,000 MWDesign · Cipher Colchis AI Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for Cipher Colchis AI Data Center Campus; capacity remains classified as future potential.

Aug 10, 2026
Colchis project status and capacity disclosed
Completed
Land secured and grid studies submitted; 2028 target subject to ERCOT
Forecast

Infrastructure

Electric GridPlanned Or Represented

1,000 MW

Cipher presents 1,000 MW of gross pipeline capacity subject to the ERCOT batch process.

Site FacilityPlanned Or Represented

Planned large-load grid interconnection and hyperscale data center campus.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Colchis campus | Texas | precise boundary undisclosed
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
1,000 MW
Design
Capacity Basis
Cipher presents 1,000 MW of gross pipeline capacity subject to the ERCOT batch process.
Actual
Development Scale
1,000 MW gross pipeline capacity
Actual
Development Milestone
Land secured
Actual
Power Arrangement
Deposits funded
Actual
Site Configuration
Target energization in 2028 subject to ERCOT.
Actual