Skip to content
All records
Data center siteSite record

Clearstone Ebbsfleet Data Center Campus

Ebbsfleet, England, United KingdomProposed
Capacity
300 MW
Planned / design
Lead participant
Clearstone
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Clearstone Ebbsfleet Data Center Campus

Clearstone is advancing a proposed AI-ready data center campus in Ebbsfleet, Kent. The disclosed concept is designed for up to 300 MW across a 145-acre site. Clearstone is associated with the development in Ebbsfleet, Kent, England, GB. The disclosed development scope includes up to 300 MW planned design; 145-acre site; target operations around 2030. Power and physical infrastructure include large multi-building campus proposed near London and regional power infrastructure. Clearstone describes a proposed campus of up to 300 MW.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design300 MWDesign · Clearstone Ebbsfleet Data Center Campus
Design300 MWDesign · Clearstone Ebbsfleet Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for Clearstone Ebbsfleet Data Center Campus; capacity class is design.

Clearstone Kent AI Campus development disclosed
Completed
Proposed campus in planning development
Forecast

Infrastructure

Electric GridPlanned Or Represented

300 MW

Clearstone describes a proposed campus of up to 300 MW.

Site FacilityPlanned Or Represented

Large multi-building campus proposed near London and regional power infrastructure.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Clearstone campus | Ebbsfleet | Kent | United Kingdom
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
300 MW
Design
Capacity Basis
Clearstone describes a proposed campus of up to 300 MW.
Actual
Location Context
Clearstone campus | Ebbsfleet | Kent | United Kingdom
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
300 MW
Design
Capacity Basis
Clearstone describes a proposed campus of up to 300 MW.
Actual
Development Scale
Up to 300 MW planned design
Actual
Development Milestone
145-Acre site
Actual
Power Arrangement
Target operations around 2030.
Actual
Site Configuration
Clearstone campus | Ebbsfleet | Kent | United Kingdom
Actual