CloudHQ QRO Campus

Querétaro, MexicoUnder construction
Capacity
360 MW
Planned critical IT
Lead participant
CloudHQ
Developer
Last updated
Aug 27, 2026
Most recent public record update

About CloudHQ QRO Campus

CloudHQ is developing its QRO Campus in Querétaro, Mexico. The six-building plan provides 360 MW of total critical IT load and approximately 2.74 million square feet, with ready-for-service targeted within 2027. On-site substation connected through 400 kV transmission.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load360 MWDesign · CloudHQ QRO Campus
It Load360 MWDesign · CloudHQ QRO Campus

Development

1 phases · 2 milestones
Construction programUnder Construction

CloudHQ QRO Campus: Under construction.

CloudHQ QRO Campus: Development-stage campus with ready-for-service targeted within 2027.
In Progress
CloudHQ QRO Campus — Under construction
In Progress

Infrastructure

Electric GridPlanned Or Represented

360 MW

360 MW planned or design IT capacity

Site FacilityPlanned Or Represented

On-site substation connected through 400 kV transmission.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
CloudHQ QRO Campus | Querétaro | Mexico
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
360 MW
Design
Capacity Basis
Source stated total campus critical IT load
Actual
Project Identity
CloudHQ QRO Campus
Actual
Lifecycle Status
Under construction
Actual
Location
Querétaro, Querétaro, MX
Actual
Participant Roles
CloudHQ
Actual
Capacity
360 MW
Design
Capacity Basis
360 MW planned or design IT capacity
Actual
Development Scale
Six buildings; 360 MW critical IT
Actual
Infrastructure
On site substation connected through 400 kV transmission.
Actual