Cloverleaf Infrastructure Troy Campus
- Planned / design
- 500 MW
- Updated
- Oct 28, 2026
Troy’s February 2, 2026 council minutes record the mayor’s statement that the original Route 162/US 40 site was off the table and a southern alternative was again being explored. This is a site-specific change, not approval of a replacement site or cancellation of all potential development in Troy. Cloverleaf’s Project Beacon was initially presented as a proposed 500 MW data center campus in Troy, Illinois. The earlier concept plans showed either a six-building Phase 1 on about 165 acres or a four-building full-build layout on roughly 275 acres; no formal application had been filed when the project was first presented, and zoning and utility approvals remain required.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Cloverleaf’s Project Beacon is a proposed 500 MW data center campus in Troy, Illinois. Concept plans show either a six-building Phase 1 on about 165 acres or a four-building full-build layout on roughly 275 acres; no formal application had been filed when the project was first presented, and zoning and utility approvals remain required.
Milestones (2)
Jan 8, 2026 · Recorded actual event
Completed · Announced
Source not linkedFeb 10, 2026 · Recorded actual event
Completed · Announced
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Cloverleaf Infrastructure Troy Campus public-record research record · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (1)
Potential or planned
500 MW
Ameren/MISO approvals and customer-funded upgrades required.
Project map
Other · Documented
Project Beacon
City of Troy
Jan 27, 2026
Sources (1)
- Cloverleaf proposes Troy campus · Jan 27, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.