Colt Berlin 1 and 2 Data Centres
- Planned critical IT
- 54 MW
- Updated
- Oct 28, 2026
Colt Berlin 1 and 2 Data Centres is a two-building German development with 54 MW of future IT capacity. Its 80 MVA secured supply is a grid-service envelope rather than IT capacity, and the 2028 delivery timing remains a target. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Colt Berlin 1 and 2 Data Centres is a two-building German development with 54 MW of future IT capacity. Its 80 MVA secured supply is a grid-service envelope rather than IT capacity, and the 2028 delivery timing remains a target. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (2)
Feb 10, 2026 · Recorded actual event
Completed · Announced
Source not linked2028 · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Colt Berlin 1 and 2 Data Centres official profile · Aug 28, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Capacity basis
ActualColt Data Centre Services publishes 54 MW of IT power for this project boundary.
SourceCapacity basis
Actual54 MW is the published future facility or full build IT boundary; it is not operating load.
SourceCapacity basis
Actual54 MW is the published future facility or full build IT boundary; it is not operating load.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Planned or represented
54 MW
54 MW is the published future facility or full-build IT boundary; it is not operating load.
Planned or represented
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Planned or represented
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (3)
Partially operational · Berlin, Germany
Same locality: Berlin
Compare in a collectionPartially operational · Berlin, Germany
Same locality: Berlin
Compare in a collectionUnder construction · Berlin, Germany
Same locality: Berlin
Compare in a collection