Colt Frankfurt 3 Data Centre
- Planned critical IT
- 32.4 MW
- Updated
- Oct 28, 2026
Colt Frankfurt 3 is a three-storey, 32.4 MW facility under construction. Its capacity is a future IT design, while the gross floor area and construction milestone are retained as separate evidence. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Colt Frankfurt 3 is a three-storey, 32.4 MW facility under construction. Its capacity is a future IT design, while the gross floor area and construction milestone are retained as separate evidence. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
Oct 8, 2024 · Recorded actual event
Completed · Construction started
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Colt Frankfurt 3 Data Centre official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualColt Data Centre Services publishes 32.4 MW of IT power for this project boundary.
SourceCapacity basis
Actual32.4 MW is the published future facility or full build IT boundary; it is not operating load.
SourceCapacity basis
Actual32.4 MW is the published future facility or full build IT boundary; it is not operating load.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Planned or represented
32.4 MW
32.4 MW is the published future facility or full-build IT boundary; it is not operating load.
Planned or represented
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Planned or represented
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Operating · Frankfurt, Hesse, Germany
Same locality: Frankfurt · Shared participant: Colt Data Centre Services
Compare in a collectionOperating · Frankfurt, Hesse, Germany
Same locality: Frankfurt
Compare in a collectionOperating · Frankfurt, Hesse, Germany
Same locality: Frankfurt
Compare in a collectionOperating · Frankfurt, Hesse, Germany
Same locality: Frankfurt
Compare in a collection