Data center siteSite record

CleanCore West Texas AI Data Center Campus

Texas, United StatesPreconstruction
Capacity
200 MW
Planned / design
Lead participant
CleanCore Solutions
Developer
Last updated
Aug 27, 2026
Most recent public record update

About CleanCore West Texas AI Data Center Campus

CleanCore Solutions closed on the initial phase of a West Texas AI data center site. The disclosed first phase covers 200 MW, with the site described as capable of scaling beyond 500 MW. CleanCore Solutions is associated with the development in West Texas location undisclosed, TX, US. The disclosed development scope includes 200 MW initial planned phase; more than 500 MW potential; precise location undisclosed. Power and physical infrastructure include phased West Texas campus development. CleanCore identifies 200 MW for the initial transaction phase. The sponsor committed to fund the initial 200 MW development through 2029, including $100 million expected by the first quarter of 2027.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design200 MWDesign · CleanCore West Texas AI Data Center Campus
Design200 MWDesign · CleanCore West Texas AI Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for CleanCore West Texas AI Data Center Campus; capacity class is design.

Jul 31, 2026
CleanCore 500 MW West Texas Campus development disclosed
Completed
Initial site transaction closed; phased development planned
Forecast

Infrastructure

Electric GridPlanned Or Represented

200 MW

CleanCore identifies 200 MW for the initial transaction phase.

Site FacilityPlanned Or Represented

Phased West Texas campus development.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
CleanCore AI campus | West Texas | precise boundary undisclosed
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
200 MW
Design
Capacity Basis
CleanCore identifies 200 MW for the initial transaction phase.
Actual
Location Context
CleanCore AI campus | West Texas | precise boundary undisclosed
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
200 MW
Design
Capacity Basis
CleanCore identifies 200 MW for the initial transaction phase.
Actual
Development Scale
200 MW initial planned phase
Actual
Development Milestone
More than 500 MW potential
Actual
Power Arrangement
Precise location undisclosed.
Actual
Site Configuration
CleanCore AI campus | West Texas | precise boundary undisclosed
Actual