CDC Hume Campus Two

Hume, Australian Capital Territory, AustraliaOperating
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Hume Campus Two contains HU4-HU5 and reports 51 MW of operating capacity. CDC Hume Campus Two is located in Hume, ACT, AU and is a data center campus in operating status.

Program relationships

Capacity

Current operating capacity

Actual

51 MW

Not included in reviewed operating IT capacity

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

HU4Operational

1 building

Hindmarsh documents Tier IV design; facility MW unresolved.

HU5Operational

1 building

Facility opening date and MW unresolved.

Participants

CDC Data Centres

Operator · Owner

Sources by role
Operator / Owner (1)
Other participants (1)
Hindmarsh

Contractor

Sources by role
Contractor (1)

Additional project facts

Operating data center count

Actual

2 data centres

Source

HU4 tier iv design

Actual

True

Source

Infrastructure & permits

Technical details (1)
Electric grid

Operational

51 MW

Current operating campus capacity; HU4-HU5 split undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
CDC Hume Campus One

Operating · Hume, Australian Capital Territory, Australia

Same locality: Hume · Shared participant: CDC Data Centres