Skip to content
All records
Data center siteSite record

CDC Hume Campus Two

Hume, Australian Capital Territory, AustraliaOperating / Stabilized
Capacity
51 MW
Operating critical IT
Lead participant
CDC Data Centres
Operator · Owner
Last updated
Aug 25, 2026
Most recent public record update

About CDC Hume Campus Two

Hume Campus Two contains HU4-HU5 and reports 51 MW of operating capacity. CDC Hume Campus Two is located in Hume, ACT, AU and is a data center campus in operating status. Participants include CDC Data Centres as owner, CDC Data Centres as operator, Hindmarsh as contractor. Published specifications include 51 MW of operating IT capacity. Development comprises HU4 (operating), HU5 (operating). campus operating capacity — 51 MW: Current operating campus capacity; HU4-HU5 split undisclosed.

Program relationships

1 linked

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load51 MWActual · CDC Hume Campus Two

Development

2 phases · 0 milestones
HU4Operational

Hindmarsh documents Tier IV design; facility MW unresolved.

1 building

HU5Operational

Facility opening date and MW unresolved.

1 building

Infrastructure

Electric GridOperational

51 MW

Current operating campus capacity; HU4-HU5 split undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

3 facts
Operating Data Center Count
2 data centres
Actual
Current Operating Capacity
51 MW
Actual
HU4 Tier Iv Design
True
Actual