CDC Hume Campus One
Operating / Stabilized · Hume, Australian Capital Territory, Australia
Hume Campus Two contains HU4-HU5 and reports 51 MW of operating capacity. CDC Hume Campus Two is located in Hume, ACT, AU and is a data center campus in operating status. Participants include CDC Data Centres as owner, CDC Data Centres as operator, Hindmarsh as contractor. Published specifications include 51 MW of operating IT capacity. Development comprises HU4 (operating), HU5 (operating). campus operating capacity — 51 MW: Current operating campus capacity; HU4-HU5 split undisclosed.
Projects sharing a market, utility, or organization.
Operating / Stabilized · Hume, Australian Capital Territory, Australia
Hindmarsh documents Tier IV design; facility MW unresolved.
1 building
Facility opening date and MW unresolved.
1 building
51 MW
Current operating campus capacity; HU4-HU5 split undisclosed.