Data center siteSite record

Centersquare CMH1 Lewis Center Data Center

Lewis Center, Ohio, United StatesOperating / Stabilized
Capacity
1.8 MW
Planned / design
Lead participant
Centersquare
Operator
Last updated
Sep 2, 2026
Most recent public record update

About Centersquare CMH1 Lewis Center Data Center

Centersquare CMH1 is an operating data center at 8180 Green Meadows Drive North, Lewis Center, OH. The facility provides 18,704 square feet of raised-floor space with 35.8 MW of utility service and 1.8 MW of UPS capacity. Carrier-neutral network access and redundant electrical and mechanical systems support colocation and enterprise workloads.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design1.8 MWActual · Centersquare CMH1 Lewis Center Data Center

Development

1 phases · 0 milestones
CMH1 facilityOperational

Operating data center facility.

Infrastructure

Utility ServiceOperational

35.8 MW

35.8 MW utility-service capacity.

Electric GridOperational

1.8 MW

1.8 MW UPS design capacity.

FiberOperational

Carrier-neutral interconnection platform.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

2 facts
Reported Capacity
1.8 MW operating UPS design capacity MW
Actual
Raised Floor Area
18,704 sq. ft.
Actual