All records
Data center siteSite record
Centersquare CMH1 Lewis Center Data Center
Lewis Center, Ohio, United StatesOperating / Stabilized
Capacity
1.8 MW
Planned / design
Lead participant
Centersquare
Operator
Last updated
Sep 2, 2026
Most recent public record update
About Centersquare CMH1 Lewis Center Data Center
Centersquare CMH1 is an operating data center at 8180 Green Meadows Drive North, Lewis Center, OH. The facility provides 18,704 square feet of raised-floor space with 35.8 MW of utility service and 1.8 MW of UPS capacity. Carrier-neutral network access and redundant electrical and mechanical systems support colocation and enterprise workloads.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Design1.8 MWActual · Centersquare CMH1 Lewis Center Data Center
Development
1 phases · 0 milestonesCMH1 facilityOperational
Operating data center facility.
Infrastructure
Utility ServiceOperational
35.8 MW
35.8 MW utility-service capacity.
Electric GridOperational
1.8 MW
1.8 MW UPS design capacity.
FiberOperational
Carrier-neutral interconnection platform.
Project map
0 of 1 project point mappedInfrastructure facts
3
Mapped records
1
Capacity figures
2
No map point available
Power & interconnection: 2Fiber & connectivity: 1
Facts & sources
Published claims and their source links.
Reported Capacity1.8 MW operating UPS design capacity MWActual
1.8 MW operating UPS design capacity MW
Raised Floor Area18,704 sq. ft.Actual
18,704 sq. ft.